![Mcqmate logo](https://mcqmate.com/public/images/logos/logo-black.png)
![Mcqmate logo](https://mcqmate.com/public/images/logos/logo-white.png)
McqMate
Q. |
In a canal section, which is in partial filling and partial cutting |
A. | the full supply level of the canal is above the natural surface level |
B. | the bed level of the canal is below the natural surface level |
C. | the full supply level of the canal is below the natural surface level |
D. | the bed level of the canal is above the natural surface level |
E. | both (a) and (b) |
Answer» E. both (a) and (b) |
View all MCQs in
Irrigation EngineeringNo comments yet