McqMate
Sign In
Hamberger menu
McqMate
Sign in
Sign up
Home
Forum
Search
Ask a Question
Sign In
McqMate Copyright © 2025
→
Civil Engineering
→
Estimating and Costing
→
S: 1 and length is
Q.
S: 1 and length is
A.
d × d × s
B.
d2× (ds)2]
C.
l.d 1 + s2)
D.
2 l.d 1 + s2)
Answer» C. l.d 1 + s2)
1.4k
0
Do you find this helpful?
14
View all MCQs in
Estimating and Costing
Discussion
No comments yet
Login to comment
Related MCQs
The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is
In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and
If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by
The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is
Cost of fittings and their fixing is specified for the following sanitary fittings
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as
The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is
The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is
Size, capacity and materials need be specified for