McqMate
Q. |
If a 0.7% upgrade meets a 0.65% downgrade at a summit and the permissible rate of change of grade per chain length is 0.10%, the length of the vertical curve, is |
A. | 10 chains |
B. | 12 chains |
C. | 14 chains |
D. | 16 chains |
Answer» C. 14 chains |
View all MCQs in
Railway EngineeringNo comments yet