Material Requirement Planning(MRP) utilizes software applications for scheduling _________. |
A. | sales management. |
B. | production processes. |
C. | marketing techniques. |
D. | human resource management. |
Answer» B. production processes. |
2. |
ERP supports __________ currency value. |
A. | multiple. |
B. | single. |
C. | three. |
D. | five. |
Answer» A. multiple. |
3. |
ERP package will handle ________ business functionalities. |
A. | one. |
B. | two. |
C. | three. |
D. | all. |
Answer» D. all. |
4. |
The most important step of ERP implementation is _________ phase. |
A. | installing. |
B. | training. |
C. | gap analysis. |
D. | testing. |
Answer» C. gap analysis. |
5. |
An enterprise is a group of people with ________. |
A. | common goal. |
B. | separate goal for each department. |
C. | multiple goals. |
D. | two or more goals. |
Answer» A. common goal. |
6. |
In _________, entire organization is considered as a system and the departments are its subsystem. |
A. | business way. |
B. | general. |
C. | enterprise way. |
D. | planning. |
Answer» C. enterprise way. |
7. |
An information system produces information using the ________ cycle. |
A. | data analysis. |
B. | input-process-output. |
C. | input-output. |
D. | process-input-output. |
Answer» B. input-process-output. |
8. |
__________ used to support the old process to become useful in the new
|
A. | transitioning the information. |
B. | software management. |
C. | front-office software. |
D. | information system. |
Answer» A. transitioning the information. |
9. |
Which of the following method is used to produce reports about data. |
A. | decision support systems. |
B. | executive information systems. |
C. | query/report writing tool. |
D. | all the above. |
Answer» D. all the above. |
10. |
_________ approaches reduces data redundancy and provide update information. |
A. | legacy system. |
B. | information system. |
C. | integrated data model. |
D. | data base. |
Answer» C. integrated data model. |
11. |
The elapsed time between placing an order and it receiving it is also known as _____. |
A. | elapsed time. |
B. | waiting time. |
C. | time interval. |
D. | expected time. |
Answer» A. elapsed time. |
12. |
In order to reduce the lead times, the organization should have an efficient __________ system. |
A. | purchasing. |
B. | production planning. |
C. | inventory. |
D. | integrated inventory. |
Answer» D. integrated inventory. |
13. |
Customer specific products are also known as __________. |
A. | make-to-stock. |
B. | make-to-order. |
C. | goods. |
D. | expected products. |
Answer» B. make-to-order. |
14. |
Using __________ system, business can gain effective control over engineering change orders. |
A. | engineering change control. |
B. | engineering change order. |
C. | inventory. |
D. | production planning. |
Answer» A. engineering change control. |
15. |
In the case of make-to-order items, the ERP systems save time by integrating with _______ systems. |
A. | engineering change control. |
B. | engineering change order. |
C. | cad and cam. |
D. | cad. |
Answer» C. cad and cam. |
16. |
The __________ planning features of most ERP systems offer, both rough cut and detailed capacity planning. |
A. | capacity. |
B. | production. |
C. | marketing. |
D. | test. |
Answer» A. capacity. |
17. |
_________ is a key issue in the formation of strategic plans in companies. |
A. | computerized. |
B. | quantity. |
C. | quality. |
D. | flexibility. |
Answer» D. flexibility. |
18. |
The business information has _______ fundamental characteristics. |
A. | 1 |
B. | 2 |
C. | 3 |
D. | many |
Answer» C. 3 |
19. |
The CRM system consist of ____ components. |
A. | 2. |
B. | 3. |
C. | 5. |
D. | many. |
Answer» B. 3. |
20. |
_________ is the first phase in BPR. |
A. | begin organizational change. |
B. | identifying bpr opportunities. |
C. | reengineering the process. |
D. | blueprint the new business system. |
Answer» A. begin organizational change. |
21. |
The first step in business strategy is ________. |
A. | planning. |
B. | develop blueprint. |
C. | marketing. |
D. | assessment. |
Answer» D. assessment. |
22. |
During the ___________ session the reengineering must also consider new technologies. |
A. | planning |
B. | implementing. |
C. | brainstorming. |
D. | training. |
Answer» C. brainstorming. |
23. |
The reengineering team must consider _________ in the redesign of a process. |
A. | all resources. |
B. | all process stakeholders. |
C. | existing system. |
D. | legacy system. |
Answer» B. all process stakeholders. |
24. |
The ________ contains models of the redesigned organizational structure. |
A. | planning report. |
B. | blueprint. |
C. | marketing strategy. |
D. | implementation report. |
Answer» B. blueprint. |
25. |
Transforming the workforce will require a _________. |
A. | array of activities. |
B. | blueprint. |
C. | training and education. |
D. | planning. |
Answer» A. array of activities. |
26. |
The primary concept of _________ is that storing huge amount of data. |
A. | data mining. |
B. | olap. |
C. | supply chain management. |
D. | data warehousing. |
Answer» D. data warehousing. |
27. |
A data warehouse is a collection of _________ that is critical to the successful execution of enterprise initiatives. |
A. | raw data. |
B. | tables. |
C. | computer based information. |
D. | reports. |
Answer» C. computer based information. |
28. |
W.H.Inmon is credited as the father _________ concepts. |
A. | data mining. |
B. | data warehouse. |
C. | bpr. |
D. | olap. |
Answer» B. data warehouse. |
29. |
The heart of data warehouse is its ________ where the bulk of data resides. |
A. | current data. |
B. | raw data. |
C. | new data. |
D. | reports. |
Answer» A. current data. |
30. |
The data warehouse archives contain __________ of significant, continuing interest and value to the enterprise. |
A. | new data. |
B. | current data. |
C. | old data. |
D. | meta data. |
Answer» C. old data. |
31. |
____________ oversee the day-to-day operations of respective functional areas during ERP implementation. |
A. | consultant. |
B. | package vendor. |
C. | end users. |
D. | functional managers |
Answer» D. functional managers |
32. |
Data mining is a powerful new technology to __________ from large databases. |
A. | extraction of hidden predictive information. |
B. | generating reports. |
C. | retrieving data. |
D. | show result. |
Answer» A. extraction of hidden predictive information. |
33. |
__________ is used to produce reports about data. |
A. | data access. . |
B. | dss,eis and query writing tools. |
C. | dss |
D. | query writing tools |
Answer» B. dss,eis and query writing tools. |
34. |
The __________ used by the data mining for the creation of information about data. |
A. | data verification. |
B. | data validation. |
C. | discovery model. |
D. | analysis model. |
Answer» C. discovery model. |
35. |
__________ is the task of identifying a finite set of most categories the data set. |
A. | predicting. |
B. | classification. |
C. | deviation detection. |
D. | clustering. |
Answer» D. clustering. |
36. |
The OLAP concept has _________ rules. |
A. | 12 |
B. | 10 |
C. | 5 |
D. | 50 |
Answer» A. 12 |
37. |
OLAP transforms data warehouse data into _________. |
A. | reports. |
B. | strategic information. |
C. | existing data. |
D. | tables. |
Answer» B. strategic information. |
38. |
A _________ provides more than the ability to "slice and dice". |
A. | single dimensional view of data. |
B. | reports. |
C. | multi dimensional view of data. |
D. | forms. |
Answer» C. multi dimensional view of data. |
39. |
___________ focus on the process of communicating, teaching, demonstrating
|
A. | management consultants. |
B. | application consultants. |
C. | package vendors. |
D. | functional participants. |
Answer» B. application consultants. |
40. |
________ departments use OLAP for applications such as budgeting, activity based costing and so on. |
A. | financial. |
B. | marketing. |
C. | purchasing. |
D. | sales. |
Answer» A. financial. |
41. |
________ information is computed data that usually reflects complex relationships. |
A. | database. |
B. | just-in-time. |
C. | real. |
D. | processed. |
Answer» B. just-in-time. |
42. |
OLAP databases must be able to do more than ________. |
A. | complex aggregation. |
B. | expected result. |
C. | simple aggregation. |
D. | derived result. |
Answer» C. simple aggregation. |
43. |
The computation of the _________ is one of the most complex calculations. |
A. | forecast. |
B. | production. |
C. | sales. |
D. | planning. |
Answer» A. forecast. |
44. |
Expand DRP. |
A. | data reprocessing. |
B. | descriptive requirements planning. |
C. | distribution requirements planning. |
D. | data requirements planning. |
Answer» C. distribution requirements planning. |
45. |
_________ is one of the benefits of supply chain management. |
A. | easy process. |
B. | manufacturing make-to-stock products. |
C. | minimum time. |
D. | faster response-to-market changes. |
Answer» D. faster response-to-market changes. |
46. |
_________ is a track-proven technology applicable to every company. |
A. | olap. |
B. | supply chain management. |
C. | data mining. |
D. | data warehousing. |
Answer» B. supply chain management. |
47. |
The companies can use supply chain management for ________. |
A. | critical business process. |
B. | effective planning. |
C. | inventory control. |
D. | material management. |
Answer» A. critical business process. |
48. |
The three fundamental characteristics of information are ________. |
A. | accuracy, relevancy and timeliness. |
B. | quality, quantity and process. |
C. | accuracy, quality and relevancy. |
D. | quality, accuracy and timeliness. |
Answer» A. accuracy, relevancy and timeliness. |
49. |
The main drawback of legacy system is ________. |
A. | less effectiveness. |
B. | high cost. |
C. | no integration. |
D. | more modules. |
Answer» C. no integration. |
50. |
________ is group of people with common goal. |
A. | department |
B. | system. |
C. | resource. |
D. | enterprise. |
Answer» D. enterprise. |
51. |
The three performance related measures are _________. |
A. | system, hardware and software. |
B. | quality, quantity and product design. |
C. | cost, time and benefits. |
D. | hardware, software and product design. |
Answer» C. cost, time and benefits. |
52. |
The _________ model fails in creating the integrated information environment in business. |
A. | traditional information. |
B. | modern information. |
C. | erp. |
D. | computerized. |
Answer» A. traditional information. |
53. |
Most organizations are implementing or planning to implement __________. |
A. | packaged software solution. |
B. | separate software solution. |
C. | simple software. |
D. | complex software. |
Answer» A. packaged software solution. |
54. |
ERP system is for _______. |
A. | major departments only. . |
B. | entire organization. |
C. | marketing and sales. |
D. | production department |
Answer» B. entire organization. |
55. |
The cost of ERP is ________. |
A. | depends on the package. |
B. | depends on available resources. |
C. | technology used |
D. | all the above. |
Answer» D. all the above. |
56. |
ASAP road-map is a detailed project plan by _______ that describes all activities in an implementation. |
A. | sap. |
B. | oracle. |
C. | peoplesoft. |
D. | baan. |
Answer» A. sap. |
57. |
The company should conduct a _________ about the implementation and implementation strategies. |
A. | feasibility study. |
B. | survey. |
C. | case study. |
D. | test. |
Answer» A. feasibility study. |
58. |
ERP implementation process has _______ phases. |
A. | one. |
B. | two. |
C. | five. |
D. | eleven. |
Answer» D. eleven. |
59. |
In pre-selection phase, _______ packages will be selected. |
A. | 5. |
B. | 10. |
C. | 15. |
D. | more than 15. |
Answer» A. 5. |
60. |
PeopleSoft is strong in ________. |
A. | manufacturing. |
B. | hr. |
C. | plant and maintenance. |
D. | finance. |
Answer» B. hr. |
61. |
Baan company is strong in ________. |
A. | manufacturing. |
B. | hr. |
C. | plant and maintenance. |
D. | finance. |
Answer» A. manufacturing. |
62. |
What is the strategy of package evaluation? |
A. | trail and error. |
B. | accept with error. |
C. | do it right the first time. |
D. | take it as a trial. |
Answer» C. do it right the first time. |
63. |
In ___________ phase roles are identified and responsibilities assigned. |
A. | project planning. |
B. | gap analysis. |
C. | reengineering. |
D. | configuration. |
Answer» A. project planning. |
64. |
The project planning phase will be headed by _______. |
A. | management. |
B. | vendor. |
C. | erp in-charge. |
D. | consultant. |
Answer» C. erp in-charge. |
65. |
Normally the ERP package needs ________ of company's functional requirements. |
A. | 50%. |
B. | 60%. |
C. | 80%. |
D. | 100%. |
Answer» C. 80%. |
66. |
The ________ team normally includes hired consultants and the in-house team. |
A. | work team |
B. | project management team. |
C. | executive committee. |
D. | all the above. |
Answer» A. work team |
67. |
The _________ approach emphasizes the human element of necessary change within organizations. |
A. | olap. |
B. | data mining. |
C. | data warehousing. |
D. | bpr. |
Answer» D. bpr. |
68. |
Baan company users an automated configuration tool is known as _______. |
A. | industry specific templates. |
B. | orgware. |
C. | complete solutions. |
D. | automatic updation. |
Answer» B. orgware. |
69. |
The test cases must be decided specifically to find the _________ in the system. |
A. | methods. |
B. | real cases. |
C. | weak links. |
D. | loops. |
Answer» C. weak links. |
70. |
In which phase, data conversion is done? |
A. | going live. |
B. | testing. |
C. | training. |
D. | configuration. |
Answer» A. going live. |
71. |
In which phase the actual users of the system will be given training on how to use the system? |
A. | gap analysis. |
B. | reengineering. |
C. | implementation team training. |
D. | end user training. |
Answer» D. end user training. |
72. |
_______ is the last phase in ERP implementation life cycle. |
A. | testing. |
B. | end user training. |
C. | post implementation. |
D. | going live. |
Answer» C. post implementation. |
73. |
Generally an ERP implementation can be divided into _________ phases. |
A. | 1 |
B. | 2 |
C. | 3 |
D. | 4 |
Answer» A. 1 |
74. |
Which is the first phase in ERP implementation? |
A. | understanding the problem. |
B. | defining solutions. |
C. | getting down to work. |
D. | going live. |
Answer» A. understanding the problem. |
75. |
_________ should determine the characteristic of the current system before implementation. |
A. | decision makers. |
B. | project team members. |
C. | decision makers and project team members. |
D. | management. |
Answer» C. decision makers and project team members. |
76. |
Which is the most critical phase in ERP implementation? |
A. | understanding the problem. |
B. | defining solutions. |
C. | getting down to work. |
D. | going live. |
Answer» B. defining solutions. |
77. |
All basic definitions of information and data modeling will be made in ______ phase. |
A. | pre-implementation. |
B. | post implementation. |
C. | defining solutions. |
D. | going live. |
Answer» C. defining solutions. |
78. |
During the second phase of ERP implementation _______ will be created. |
A. | model of existing system. |
B. | data design. |
C. | module design. |
D. | prototype. |
Answer» D. prototype. |
79. |
Which phase is most difficult phase in ERP implementation? |
A. | getting down to work. |
B. | going live. |
C. | post implementation. |
D. | configuration. |
Answer» A. getting down to work. |
80. |
The end-user and managers are trained ______. |
A. | during implementation. |
B. | after implementation. |
C. | before implementation. |
D. | during and after implementation. |
Answer» D. during and after implementation. |
81. |
________ is one of the activities in getting down to work. |
A. | analyses existing system. |
B. | analyses above new system. |
C. | identifying roles. |
D. | document the new procedures. |
Answer» D. document the new procedures. |
82. |
ERP packages are ________ and set of functionalities. |
A. | same architecture. |
B. | different architecture. |
C. | same concept. |
D. | different concept. |
Answer» B. different architecture. |
83. |
In the initial stages ERP packages were targeted at ________ industry. |
A. | manufacturing. |
B. | non-manufacturing. |
C. | both manufacturing and non-manufacturing. |
D. | service oriented industry. |
Answer» A. manufacturing. |
84. |
______ process decides the success or failure of the project. |
A. | handling the vendors. |
B. | role of technology. |
C. | selection process. |
D. | implementation. |
Answer» C. selection process. |
85. |
To evaluate the process during implementation ______ is essential. |
A. | executive committee. |
B. | top management. |
C. | consultation. |
D. | evaluation committee. |
Answer» D. evaluation committee. |
86. |
______ is one of the objectives when selecting a ERP package. |
A. | accuracy. |
B. | flexibility. |
C. | project planning. |
D. | gap analysis. |
Answer» B. flexibility. |
87. |
Most ERP packages are stronger in _____ areas. |
A. | all. |
B. | less. |
C. | certain. |
D. | general. |
Answer» C. certain. |
88. |
Market risk management plays a vital role in analyzing _______. |
A. | company\s growth. |
B. | company\s competitiveness. |
C. | company\s sales. |
D. | product quality.. |
Answer» B. company\s competitiveness. |
89. |
During analysis it is important to investigate ____________ of the different packages. |
A. | effectiveness. |
B. | worth. |
C. | cost. |
D. | origin. |
Answer» D. origin. |
90. |
The _________________ are constantly striving to lower configuration costs. |
A. | vendors. |
B. | consultants. |
C. | management. |
D. | employees. |
Answer» A. vendors. |
91. |
___________ function helps in hiring the right people with the right skills. |
A. | recruitment management. |
B. | personnel administration. |
C. | personnel management. |
D. | organizational management. |
Answer» A. recruitment management. |
92. |
Project planning phase is ________________________ in ERP implementation. |
A. | first phase. |
B. | third phase. |
C. | fifth phase. |
D. | seventh phase. |
Answer» B. third phase. |
93. |
For training the employees will be divided into groups based on their_____________. |
A. | qualification. . |
B. | department. |
C. | computer knowledge. |
D. | current skill levels |
Answer» D. current skill levels |
94. |
In ERP system ______ is important. |
A. | upgrading techniques. |
B. | modification. |
C. | maintenance. |
D. | evaluation. |
Answer» A. upgrading techniques. |
95. |
A successful training will account for a minimum of ______of the total project cost. |
A. | 10-15%. |
B. | 10-20%. |
C. | 5-10%. |
D. | 5-15% |
Answer» A. 10-15%. |
96. |
Testing the links between ERP packages and other corporate software links that
|
A. | sample. |
B. | case-to-case. |
C. | random. |
D. | time. |
Answer» B. case-to-case. |
97. |
When testing ERP system, _____________ is recommended. |
A. | using dummy data. |
B. | using sample value. |
C. | using approximate value. |
D. | running a real purchase order. |
Answer» D. running a real purchase order. |
98. |
In legacy system, most of the data are__________________________. |
A. | exact data. |
B. | approximate data. |
C. | redundant. |
D. | derived data. |
Answer» C. redundant. |
99. |
Users with heavy data analysis needs should include the cost of _________ in the ERP budget. |
A. | software. |
B. | analysis tool. |
C. | data warehouse. |
D. | hardware. |
Answer» C. data warehouse. |
100. |
Once the ERP system is implemented the current ______________ will be replaced by new ones. |
A. | process. |
B. | procedures. |
C. | techniques. |
D. | process and procedures. |
Answer» D. process and procedures. |