Let p0 be the incoming fraction defective and p1 be the outgoing fraction defective (Assume both p1 and p0 is greater than 0). If rectifying inspection is performed then: |
A. | P0<p1 |
B. | P1<p0 |
C. | None of the above |
D. | Cannot be determined |
Answer» B. P1<p0 |