Q. |
In post-tensioning system |
A. | wires are fist tensioned followed by concreting |
B. | tensioning of wires and concreting is simultaneously done |
C. | the wires are tensioned against hardened concrete |
D. | none of the above |
Answer» C. the wires are tensioned against hardened concrete |