Critical path lies along the activities ...
Q.
Critical path lies along the activities having total float
A.
Positive
B.
Negative
C.
Zero
D.
Same
Answer» C. Zero
4.1k
0
Do you find this helpful?
28
View all MCQs in
Construction Management
Discussion
No comments yet
Login to comment
Related MCQs
Consider the following statements: In the critical path method of construction planning, Free Float can be. 1. Greater than Total Float. 2. Greater than Independent Float 3. Equal to Total Float. 4. Less than Independent Float. Of these statements
In the time-cost optimisation, using CPM method for network analysis, the crashing of the activities along the critical path is done starting with the activity having
Total float for any activity is defined as the difference between
Whenever an activity has zero total float, then
If the total float and duration of an activity are 5 and 10 days respectively, the particular activity can be
Critical path method
For completion of a project, the critical path of the network represents
Critical path
Critical Path Net Work helps an engineer
A four wheel truck or whose operating weight is 12000 kg is pulled along a road having a rising slope of 2% at a uniform speed. Assume grade resistance factor = 10 kg/tonne. The tension in the tow cable is 720 kg. The rolling resistance of the road will be