Q.

Identify the given type of joint in Concrete Structures.

A. l beam construction joint
B. t beam construction joint
C. expansion joint
D. contraction joint
Answer» B. t beam construction joint
Explanation: in case of t-beams, the ribs should be filled with concrete first and in the slabs forming the flanges can be filled up to the centre of the ribs. if a construction joint between slab and beam becomes unavoidable