Which one of the following is not a step of requirement engineering? |
| A. | elicitation |
| B. | design |
| C. | analysis |
| D. | documentation |
| Answer» B. design | |
| Explanation: requirement elicitation, requirement analysis, requirement documentation and requirement review are the four crucial process steps of requirement engineering.design is in itself a different phase of software engineering | |