1. |
The expected qualities of a product are |
A. | it satisfies the needs and expectations of the customer |
B. | It has a pleasing appearance and handles well |
C. | It has high reliability and functions safely over its intended life |
D. | all of the mentioned |
Answer» D. all of the mentioned |
2. |
determination of the amount of time required to |
A. | Method |
B. | Motion |
C. | Work |
D. | Time |
Answer» D. Time |
3. |
The 4Ms does not include . |
A. | Men |
B. | Material |
C. | Message |
D. | Machinery. |
Answer» C. Message |
4. |
In which type of production system the unit cost of production is low? |
A. | Combined production |
B. | Continuous production |
C. | Intermittent production |
D. | Custom production |
Answer» B. Continuous production |
5. |
All of the following decisions fall within the scope of operations management except for |
A. | financial analysis |
B. | Design of products and processes |
C. | location of facilities |
D. | Quality management |
Answer» A. financial analysis |
6. |
. may be defined as the ratio between output and input. |
A. | Production |
B. | Productivity |
C. | Batch production |
D. | Job production. |
Answer» B. Productivity |
7. |
A is something which is offered to customers to satisfy their needs or wants. |
A. | Process |
B. | Price |
C. | Promotion |
D. | Product |
Answer» D. Product |
8. |
Production is the process by which raw materials and other inputs are converted in to . |
A. | Finished Product |
B. | Services |
C. | Satisfaction |
D. | Loyalty |
Answer» A. Finished Product |
9. |
The competitive advantage in the production function can be achieved through . |
A. | A High wastage |
B. | More cost |
C. | Higher quality |
D. | Lowest quantity |
Answer» C. Higher quality |
10. |
Which of the following industries should be located near the vicinity of raw materials? |
A. | Cycles |
B. | Televisions |
C. | Sewing machines |
D. | Steel mills |
Answer» D. Steel mills |
11. |
If all the processing equipment and machines are arranged according to the sequence of operations of a product the layout is known as |
A. | Product layout |
B. | Process layout |
C. | Fixed position layout |
D. | Combination layout |
Answer» A. Product layout |
12. |
The following type of layout is preferred to manufacture a standard product in large quantity |
A. | Product layout |
B. | Process layout |
C. | Fixed position layout |
D. | Combination layout |
Answer» A. Product layout |
13. |
The following type of layout is preferred for low volume production of non standard products |
A. | Product layout |
B. | Process layout |
C. | Fixed position layout |
D. | Combination layout |
Answer» B. Process layout |
14. |
In ship manufacturing, the type of layout preferred is |
A. | Product layout |
B. | Process layout |
C. | Fixed position layout |
D. | Combination layout |
Answer» C. Fixed position layout |
15. |
Raw Materials and WIP can be classified under |
A. | Indirect Material |
B. | Direct Material |
C. | Finished Material |
D. | Standard Parts |
Answer» B. Direct Material |
16. |
The first activity of Purchasing cycle is |
A. | Communicating requirement to the purchase |
B. | Source Selection and development |
C. | Recognizing the need for procurement |
D. | Inspection of goods |
Answer» C. Recognizing the need for procurement |
17. |
TQM stands for |
A. | Total Quality Management |
B. | Total Quantity Management |
C. | Total Qualitative Management |
D. | To question management |
Answer» A. Total Quality Management |
18. |
Kaizen is a process, the purpose of which goes beyond simple productivity improvement. |
A. | weekly |
B. | daily |
C. | monthly |
D. | annual |
Answer» B. daily |
19. |
"Poka-yoke" is the Japanese term for |
A. | Card |
B. | Fool proof |
C. | Continuous improvement |
D. | Fishbone diagram |
Answer» B. Fool proof |
20. |
Kaizen is a Japanese term meaning |
A. | continuous improvement |
B. | Just-in-time (JIT) |
C. | a fishbone diagram |
D. | setting standards |
Answer» A. continuous improvement |
21. |
Which of the following is not an inventory? |
A. | Machines |
B. | Raw material |
C. | Finished products |
D. | Consumable tools |
Answer» A. Machines |
22. |
Which of the following is true for Inventory control? |
A. | Economic order quantity has minimum total cost |
B. | Inventory carrying costs increases with quantity per order |
C. | Ordering cost decreases with lo size |
D. | All of the above |
Answer» D. All of the above |
23. |
Re-ordering level is calculated as |
A. | Maximum consumption rate x Maximum re-order |
B. | Minimum consumption rate x Minimum re-order |
C. | Maximum consumption rate x Minimum re-order |
D. | Minimum consumption rate x Maximum re-order |
Answer» A. Maximum consumption rate x Maximum re-order |
24. |
The nerve center or brain of any computer sy |
A. | CPU |
B. | Storage device |
C. | ALU |
D. | Monitor |
Answer» A. CPU |
25. |
Maintenance consist of the following action(s) |
A. | Replace of component |
B. | Repair of component |
C. | Service of component |
D. | All of the above |
Answer» D. All of the above |
26. |
The following is (are) scheduled maintenance |
A. | Overhauling of machine |
B. | Cleaning of tank |
C. | Whitewashing of building |
D. | All of the above |
Answer» D. All of the above |
27. |
The supply chain concept originated in what disci |
A. | marketing |
B. | Operation |
C. | Logistics |
D. | Production |
Answer» A. marketing |
28. |
. A encompasses all activities associated with the flow and transformation of goods from the raw material stage, through to the end user, as well as the associated |
A. | production line |
B. | supply chain |
C. | marketing channel |
D. | warehouse |
Answer» B. supply chain |
29. |
involves verifying the physical quantities of stores in hand. |
A. | Pricing of Issues |
B. | Material control |
C. | Stock taking |
D. | None |
Answer» C. Stock taking |
30. |
In ABC analysis the category ‘A’ includes items with small quantity but high . |
A. | Weight |
B. | Value |
C. | density |
D. | None |
Answer» B. Value |
Done Studing? Take A Test.
Great job completing your study session! Now it's time to put your knowledge to the test. Challenge yourself, see how much you've learned, and identify areas for improvement. Don’t worry, this is all part of the journey to mastery. Ready for the next step? Take a quiz to solidify what you've just studied.