| Q. |
Preliminary project report for a road project must contain |
| A. | The detailed estimated cost based on detailed design |
| B. | The several alternatives of the project that have been considered |
| C. | The soil survey, traffic survey, concept design and approximate cost |
| D. | The contract documents for inviting tenders |
| Answer» C. The soil survey, traffic survey, concept design and approximate cost | |