Total no of grades for registration of c...
Q.
Total no of grades for registration of contractor with governments are
A.
3
B.
5
C.
7
D.
4
Answer» C. 7
2.6k
0
Do you find this helpful?
6
View all MCQs in
Construction Project Management
Discussion
No comments yet
Login to comment
Related MCQs
Which of the following is not role of contractor
SD, mobilization advance and cost of materials given to contractor will be deducted from
In which of the following contract; contractor tries to complete job quickly?
In which of the following contract; contractor is quickly be agreed and work on job?
In which of the following contract; contractor is not required to deposit SD?
In which of the following contract; contractor is required to offer a fixed sum for job in all respect as per given drawings and details?
Economic cost is the only reason for which a contractor should be conscious of construction safety.
Which are the criteria to be checked for pre- qualification of contractor
The difference between the total float and free float is called
In any construction project the material cost constitute about..... % of the total project cost.