1. |
Software project management comprises of a number of activities, which contains _. |
A. | system software |
B. | application softwarec |
C. | scientific software |
D. | none |
Answer» A. system software |
2. |
Software is defined as ____ . |
A. | instructions |
B. | data structures |
C. | documents |
D. | all above |
Answer» D. all above |
3. |
What are the signs that a software project is in trouble |
A. | the product scope is poorly defined. |
B. | deadlines are unrealistic. |
C. | changes are managed poorly. |
D. | all of the above |
Answer» D. all of the above |
4. |
A Project can be characterized as _ . |
A. | every project may not have a unique and distinct goal. |
B. | project is routine activity or day-to-day operations. |
C. | project does not comes with a start time and end time. |
D. | none |
Answer» D. none |
5. |
CMM model in Software Engineering is a technique of ______ . |
A. | develop the software. |
B. | improve the software process. |
C. | improve the testing process. |
D. | all of above |
Answer» B. improve the software process. |
6. |
Project risk factor is considered in which model |
A. | spiral model |
B. | waterfall model |
C. | prototyping model |
D. | none of the above. |
Answer» A. spiral model |
7. |
Effective software project management focuses on the four P’s. What are those four P’s? |
A. | people, performance, payment, product |
B. | people, product, process, project |
C. | people, product, performance, project |
D. | all |
Answer» B. people, product, process, project |
8. |
What are the signs that a software project is in trouble? |
A. | the product scope is poorly defined. |
B. | deadlines are unrealistic. |
C. | changes are managed poorly. |
D. | all |
Answer» D. all |
9. |
Software quality assurance is an umbrella activity. |
A. | true |
B. | false |
Answer» A. true |
10. |
Which of the following are the valid relationships in Use Case Diagrams |
A. | generalization |
B. | include |
C. | extend |
D. | all |
Answer» D. all |
11. |
Which one of the following is not an Evolutionary Process Model? |
A. | winwin spiral model |
B. | incremental model |
C. | concurrent development model |
D. | all of the mentioned |
Answer» D. all of the mentioned |
12. |
The Incremental Model is a result of combination of elements of which two models? |
A. | build & fix model & waterfall model |
B. | linear model & rad model |
C. | linear model & prototyping model |
D. | waterfall model & rad model |
Answer» C. linear model & prototyping model |
13. |
The spiral model was originally proposed by |
A. | ibm |
B. | barry boehm |
C. | pressman |
D. | royce |
Answer» B. barry boehm |
14. |
Spiral Model has user involvement in all its phases. |
A. | true |
B. | false |
Answer» B. false |
15. |
If you were to create client/server applications, which model would you go for? |
A. | winwin spiral model |
B. | spiral model |
C. | concurrent model |
D. | incremental model |
Answer» C. concurrent model |
16. |
Which of the following is not a phase of SDLC? |
A. | requirement gathering |
B. | maintenance |
C. | testing |
D. | all |
Answer» D. all |
17. |
Selection of particular life cycle model is based on, |
A. | requirements |
B. | technical knowledge of development team |
C. | users |
D. | all |
Answer» D. all |
18. |
Which of the following are incremental developmental models? |
A. | prototyping |
B. | agile development |
C. | both a and b |
D. | none |
Answer» C. both a and b |
19. |
In a college,students are asked to develop a software. Which model would be preferable |
A. | waterfall model |
B. | spiral model |
C. | aglie model |
D. | code nad fix model |
Answer» D. code nad fix model |
20. |
In waterfall model, output of one phase is input to next phase. |
A. | true |
B. | false |
Answer» A. true |
21. |
The first step in Software Development Life Cycle(SDLC) is |
A. | preliminary investigation and analysis |
B. | system design |
C. | system testing |
D. | coding |
Answer» A. preliminary investigation and analysis |
22. |
The detailed study of existing system is referred to as : |
A. | system planning |
B. | system analysis |
C. | feasibility study |
D. | design dfd |
Answer» B. system analysis |
23. |
System analysis and design phase of Software Development Life Cycle (SDLC) |
A. | parallel run |
B. | sizing |
C. | all of these |
D. | specifications freeze |
Answer» C. all of these |
24. |
Prototyping aims at : |
A. | end user understanding and approval |
B. | program logic |
C. | program logic |
D. | none of these |
Answer» A. end user understanding and approval |
25. |
What is a prototype ? |
A. | mini-model of existing system |
B. | mini-model of the proposed system |
C. | working model of the existing system |
D. | none |
Answer» B. mini-model of the proposed system |