a. system software
B. application softwarec
c. scientific software
d. none
a. instructions
B. data structures
c. documents
d. all above
a. the product scope is poorly defined.
B. deadlines are unrealistic.
c. changes are managed poorly.
d. all of the above
a. every project may not have a unique and distinct goal.
B. project is routine activity or day-to-day operations.
c. project does not comes with a start time and end time.
a. develop the software.
B. improve the software process.
c. improve the testing process.
d. all of above
a. spiral model
B. waterfall model
c. prototyping model
d. none of the above.
a. people, performance, payment, product
B. people, product, process, project
c. people, product, performance, project
d. all
a. true
B. false
a. generalization
B. include
c. extend
a. winwin spiral model
B. incremental model
c. concurrent development model
d. all of the mentioned
a. build & fix model & waterfall model
B. linear model & rad model
c. linear model & prototyping model
d. waterfall model & rad model
a. ibm
B. barry boehm
c. pressman
d. royce
a. winwin spiralmodel
B. spiral model
c. concurrentmodel
d. incrementalmodel
a. requirement gathering
B. maintenance
c. testing
a. requirements
B. technical knowledge of developmentteam
c. users
a. prototyping
B. agile development
c. both a and b
a. waterfall model
c. aglie model
d. code nad fix model
a. preliminary investigation and analysis
B. system design
c. system testing
d. coding
a. system planning
B. system analysis
c. feasibility study
d. design dfd
a. parallel run
B. sizing
c. all of these
d. specifications freeze
a. end user understanding and approval
B. program logic
c. program logic
d. none of these
a. mini-model of existing system
B. mini-model of the proposed system
c. working model of the existing system
Each set has max 25 mcqs
Download PDFs from app without Waiting