

McqMate
These multiple-choice questions (MCQs) are designed to enhance your knowledge and understanding in the following areas: Bachelor of Business Administration (BBA) .
51. |
Frederick Winslow Taylor is called; |
A. | father of operations research |
B. | father of marketing management |
C. | father of financial management |
D. | father of scientific management |
Answer» D. father of scientific management |
52. |
In the case of…………………. the products are produced as per the specifications of the customers within prefixed time and cost. |
A. | mass production |
B. | job production |
C. | both of these |
D. | none of these |
Answer» B. job production |
53. |
………………..is the system in whichitems are processed in lots and a new lot is undertaken for production only when the production on all items of a lot is complete. |
A. | job production |
B. | batch production |
C. | mass production |
D. | none of these |
Answer» B. batch production |
54. |
…………is the capacity that specifies a theoretical upper limit above the usual rate of routine operations. |
A. | maximum capacity |
B. | effective capacity |
C. | actual capacity |
D. | none of these. |
Answer» A. maximum capacity |
55. |
……………………………is the highest reasonable output rate which can be achieved with the current product specifications, product mix, work force, plant and equipment. |
A. | publicity |
B. | capacity |
C. | (a) and (b) |
D. | none of these |
Answer» B. capacity |
56. |
In ………………, machines and other supporting services are located according to the processing sequence of the product |
A. | project lay out |
B. | product lay out |
C. | combination lay out |
D. | none of these |
Answer» B. product lay out |
57. |
The lay out in which production operation is performed in a fixed position is called…………. |
A. | project lay out |
B. | product lay out |
C. | (a) and(b) |
D. | none of these |
Answer» A. project lay out |
58. |
The layout in which all the equipment’sperforming similar tasks are grouped together is called………………….. |
A. | )product lay out |
B. | process lay out |
C. | combination lay out |
D. | none of these |
Answer» B. process lay out |
59. |
…………….. is the configuration of departments, work centres and equipment in the conversion process. |
A. | plant lay out |
B. | plant locations |
C. | (a) and (b) |
D. | none of these. |
Answer» A. plant lay out |
60. |
Which of the following affect the choice of plant location decision? |
A. | proximity to markets |
B. | supply of materials |
C. | (a) and (b) |
D. | none of these |
Answer» C. (a) and (b) |
61. |
The founder of the scientific management movement was: |
A. | frank gilbreth |
B. | walter shewhart |
C. | frederick w.taylor |
D. | ford harris |
Answer» C. frederick w.taylor |
62. |
The Hawthorne Studies stimulated the development of: |
A. | the scientific management movement |
B. | the human relations movement |
C. | the socio-technical movement |
D. | the lean production movement. |
Answer» B. the human relations movement |
63. |
Walter Shewhart developed: |
A. | the economic order quantity model |
B. | the human factors engineering field |
C. | linear programming models |
D. | statistical quality control techniques |
Answer» D. statistical quality control techniques |
64. |
The moving assembly line was developed by: |
A. | elton mayo |
B. | frederick w. taylor |
C. | clark gable |
D. | henry ford |
Answer» D. henry ford |
65. |
……………is used to monitor characteristics that can be measured and have a continuum of values such as height, weight, volume etc. |
A. | control chart of attributes |
B. | control chart for variables |
C. | (a) and (b) |
D. | none of these |
Answer» B. control chart for variables |
66. |
……………..is used to monitor characteristics that have discrete values and can be counted |
A. | control chart for variables. |
B. | control chart for attributes |
C. | (a) and (b) |
D. | none of these |
Answer» B. control chart for attributes |
67. |
Which of the following is not a control chart for variables? |
A. | x chart |
B. | r chart |
C. | p chart |
D. | none of these |
Answer» C. p chart |
68. |
Which of the following is not a control chart for attributes? |
A. | p chart |
B. | c chart |
C. | x chart |
D. | none of these |
Answer» C. x chart |
69. |
ISO 9000 is a…………………. |
A. | international standard |
B. | national standard |
C. | local standard |
D. | none of these |
Answer» A. international standard |
70. |
In management literature TQM stands for |
A. | total quality management |
B. | total quantity management |
C. | total quantity maintenance |
D. | none of these |
Answer» A. total quality management |
71. |
………………..is a group of workers from the same area who usually meet to discuss their problems, investigate, recommend solutions and to corrective actions |
A. | quality problems |
B. | quality circle |
C. | quantify value |
D. | none of these |
Answer» B. quality circle |
72. |
Which of the following is not an objective of quality circle? |
A. | to improve quality |
B. | to improve productivity |
C. | trading on equity |
D. | none of these |
Answer» C. trading on equity |
73. |
Which of the following is not a principles’ of TQM? |
A. | customer focus |
B. | continuous improvement |
C. | team approach |
D. | black marketing |
Answer» D. black marketing |
74. |
………………is the systematic recording and critical examination of existing and the proposed way of doing work as a means of developing effective methods. |
A. | method study |
B. | time study |
C. | time booking |
D. | none of these |
Answer» A. method study |
75. |
The costs of all activities incurred to prevent poor quality in products and services. |
A. | prevention cost |
B. | appraisal cost |
C. | failure cost |
D. | none of the above |
Answer» A. prevention cost |
76. |
This cost is the cost associated with measuring evaluating, or auditing products or services to assure conformance to quality standards and performance requirements |
A. | prevention cost |
B. | appraisal cost |
C. | failure cost |
D. | none of the above |
Answer» B. appraisal cost |
77. |
This cost is the costs resulting from products or services not conforming to requirements or user needs. |
A. | prevention cost |
B. | appraisal cost |
C. | failure cost |
D. | none of the above |
Answer» C. failure cost |
78. |
…………… is a graphical tool to analyse and time the small, physical actions of workers and machine in performing a routine, repetitive, worker- machine task so that idle time can be identified |
A. | activity chart |
B. | metrics |
C. | (a) and (b) |
D. | none of these |
Answer» A. activity chart |
79. |
…………is the level of output volume for which total cost equals total revenues |
A. | profit |
B. | breakeven point |
C. | sales |
D. | all of these |
Answer» B. breakeven point |
80. |
……………. is a process of representing each item by a number, the digit of which indicates the group, the sub-group, the type and the dimension of the item. |
A. | codification |
B. | classification |
C. | duplication |
D. | none of these |
Answer» A. codification |
81. |
…………………….is a Manufacturing systems utilizing computer software programs that control the actual machine on the shop floor. |
A. | complex manufacturing |
B. | computer aided manufacturing |
C. | ( a )and (b) |
D. | none of these |
Answer» B. computer aided manufacturing |
82. |
……………is the Japanese concept of continuous improvement in all things. |
A. | kaizen |
B. | marketing myopia |
C. | (a) and (b) |
D. | none of these |
Answer» A. kaizen |
83. |
………………..is the process of creating and using mathematical representations of management problems and organizations to predict outcomes of proposed courses of action |
A. | mathematical modelling |
B. | physical modelling |
C. | service queries |
D. | .none of these |
Answer» A. mathematical modelling |
84. |
…………………………is the degree to which the design specifications for a product or service are appropriate to its function and use, and the degree to which a product or service conforms to its design specifications |
A. | quantity |
B. | quality |
C. | price |
D. | cost |
Answer» B. quality |
85. |
…………………is a process used to determine the maintenance requirements of any physical asset in its operating context? |
A. | reliability centered maintenance |
B. | preventive cost |
C. | unavoidable cost |
D. | none of these |
Answer» A. reliability centered maintenance |
86. |
…………………………..is the application or techniques designed to establish the time for a qualified worker to carry out a specified job at a defined level or performance |
A. | work measurement |
B. | work delay |
C. | work atmosphere |
D. | none of these |
Answer» A. work measurement |
87. |
………………………… deals with decision-making related to production processes so that the resulting goods or services are produced according to specifications, in the amount and by the schedule demanded and out of minimum cost. |
A. | production management |
B. | marketing management |
C. | financemanagement |
D. | capital structure |
Answer» A. production management |
88. |
………….is the part of an organization that produces the organization’s physical goods and services. |
A. | operating system |
B. | marketing system |
C. | financial system |
D. | all of these |
Answer» A. operating system |
89. |
Which of the following records quantity of material only |
A. | bin card |
B. | stores ledger |
C. | bill of materials |
D. | none of these |
Answer» A. bin card |
90. |
Which of the following is used for issuing materials to different production departments |
A. | material requisition |
B. | purchase requisition |
C. | purchase order |
D. | none of these |
Answer» A. material requisition |
91. |
Continuous stock taking is a part of |
A. | annual stock taking |
B. | perpetual inventory |
C. | abc analysis |
D. | none of these |
Answer» B. perpetual inventory |
92. |
Stores department issues materials to the production department on the basis of |
A. | goodsreceived note |
B. | purchase requisition |
C. | stores requisition |
D. | material transfer note |
Answer» C. stores requisition |
93. |
Recording of time spent by a worker on different job is called |
A. | time keeping |
B. | time booking |
C. | job card keeping |
D. | job order costing |
Answer» B. time booking |
94. |
The difference between the actual cost and standard cost is called |
A. | profit |
B. | loss |
C. | sales |
D. | variance |
Answer» D. variance |
95. |
Qualitycircle is a group of |
A. | operatives |
B. | supervisors |
C. | management trainees |
D. | top management |
Answer» A. operatives |
96. |
Safety stock is related to |
A. | inventory control |
B. | quality control |
C. | employeecontrol |
D. | strategic control |
Answer» A. inventory control |
97. |
..............is undertaken to find out the one best way of doing the thing |
A. | job analysis |
B. | merit rating |
C. | job enrichment |
D. | none |
Answer» A. job analysis |
98. |
The concept of Job enrichment is a contribution by........ |
A. | frederick herzberg |
B. | f.w.taylor |
C. | c.k. prahlad |
D. | peter f. drucker |
Answer» A. frederick herzberg |
99. |
…………… is the process of comparing actual performance with the standard and taking corrective Action. |
A. | controlling |
B. | management |
C. | planning |
D. | co-ordination |
Answer» A. controlling |
100. |
…………………aims at visualizing and identifying deviation before they actually occur. |
A. | predictive control |
B. | concurrent control |
C. | operational control |
D. | all of these |
Answer» A. predictive control |
Done Studing? Take A Test.
Great job completing your study session! Now it's time to put your knowledge to the test. Challenge yourself, see how much you've learned, and identify areas for improvement. Don’t worry, this is all part of the journey to mastery. Ready for the next step? Take a quiz to solidify what you've just studied.