101. |
In ---------type of organization, workers receive instructions from various specialists. |
A. | line |
B. | functional |
C. | informal |
D. | none |
Answer» B. functional |
102. |
……………………..is an organized creative approach which has its objective, the efficient identification of unnecessary cost—cost which provides neither quality nor use nor life nor appearance nor customer features. |
A. | money chain |
B. | value analysis |
C. | supply chain |
D. | none of these |
Answer» B. value analysis |
103. |
………………..are those materials and equipment’s which have no immediate use but have accumulated due to faulty planning, forecasting and purchasing. |
A. | surplus items |
B. | deficit items |
C. | (a) and (b) |
D. | none of these |
Answer» A. surplus items |
104. |
…………………………………. is a recording technique for micro motionstudy. |
A. | simultaneous motion cycle chart |
B. | simultaneous master cycle chart |
C. | (a) and (b) |
D. | none of these |
Answer» A. simultaneous motion cycle chart |
105. |
……………….is a priority rule that gives top priority to the waiting job whose operation time at a work center is shortest. |
A. | material shortage |
B. | shortest-processing-time rule |
C. | (a) and (b) |
D. | none of these |
Answer» B. shortest-processing-time rule |
106. |
…………………….is the process of testing the feasibility of master production schedules in terms of capacity. |
A. | rough-cut capacity planning |
B. | manpower planning |
C. | financial planning |
D. | all of these |
Answer» A. rough-cut capacity planning |
107. |
………………….involves theactivities relating to procuring materials and supplies consumed during production |
A. | selling |
B. | pricing |
C. | purchasing |
D. | distributing |
Answer» C. purchasing |
108. |
The risk or probability of incorrectly concluding that the conversion process is out of control. |
A. | type 1 error |
B. | type 2 errors |
C. | (a) and (b) |
D. | none of these |
Answer» A. type 1 error |
109. |
Operation process chart is also called as………………………….. |
A. | online chart |
B. | outline process chart |
C. | (a) and (b) |
D. | none of these |
Answer» B. outline process chart |
110. |
It is a chart where activities of more than subject (worker or equipment) are each recorded on a common time scale to show their inter-relationship. |
A. | single activity chart |
B. | multiple activity charts |
C. | charting |
D. | none of these |
Answer» B. multiple activity charts |
111. |
…………is an assigning job to work centres without considering the work centre’s capacity |
A. | infinite loading |
B. | finite loading |
C. | (a) and (b) |
D. | none of these |
Answer» A. infinite loading |
112. |
………………………is the analysis and comparisons of items to group them into families with similar characteristics |
A. | mass technology |
B. | group technology |
C. | independent technology |
D. | none of these |
Answer» B. group technology |
113. |
……………………is one that is capable of producing a variety of products (or parts) with virtually no time lost for changeovers form one product to the next. |
A. | a flexible automated system |
B. | a fixed automated system |
C. | (a) and(b) |
D. | none of these |
Answer» A. a flexible automated system |
114. |
Fixed position layout is also called as…………………. of layout |
A. | project type |
B. | product type |
C. | (a) and(b) |
D. | none of these |
Answer» A. project type |
115. |
is an information management system that connects all departments and disciplines within a company making them an integrated unit. |
A. | enterprise asset management |
B. | entrepreneurship development |
C. | manpower planning |
D. | none of these |
Answer» A. enterprise asset management |
116. |
………………………is a Computer software programs that allow a designer to carry out geometric transformations rapidly. |
A. | tally |
B. | computer-aided design |
C. | (a) and(b) |
D. | none of these |
Answer» B. computer-aided design |
117. |
……………..is the arrangement of a facility so that equipment used to make similar parts or families of parts is grouped together. |
A. | ) cellular layout |
B. | product lay out |
C. | (a) and (b) |
D. | none of these |
Answer» A. ) cellular layout |
118. |
……………is a graphical and algebraic representation of the relationships among volume of output, cost, and revenues. |
A. | break mechanism |
B. | break-even analysis |
C. | fixed analysis |
D. | none of these |
Answer» B. break-even analysis |
119. |
……………...is a technology concerned with the application of mechanical, electronic, and computer based systems to operate and control production |
A. | automation |
B. | manpower |
C. | motivation |
D. | supervision |
Answer» A. automation |
120. |
Specialization of labour in manufacturing is associated with |
A. | henry fayol |
B. | eli whitney & others |
C. | charles babbage |
D. | frederick w.taylor |
Answer» A. henry fayol |
121. |
Interchangeable parts, cost accounting is associated with |
A. | adam smith |
B. | eli whitney & others |
C. | charles babbage |
D. | frederick w.taylor |
Answer» B. eli whitney & others |
122. |
Division of labour by skill; assignment of jobs by Skill; basics of time study are contributed by |
A. | adam smith |
B. | eli whitney & others |
C. | charles babbage |
D. | frederick w.taylor |
Answer» C. charles babbage |
123. |
Scientific management, time study and work study are associated with |
A. | adam smith |
B. | eli whitney & others |
C. | charles babbage |
D. | frederick w.taylor |
Answer» A. adam smith |
124. |
Motion of study of jobs in production management is contributed by |
A. | frank b. gilbreth |
B. | henry l. gantt |
C. | f.w. harris |
D. | elton mayo |
Answer» A. frank b. gilbreth |
125. |
Scheduling techniques for employees, machines Jobs in manufacturing are associated with |
A. | frank b. gilbreth |
B. | henry l. gantt |
C. | f.w. harris |
D. | elton mayo |
Answer» B. henry l. gantt |
126. |
Economic lot sizes for inventory control is developed by |
A. | frank b. gilbreth |
B. | henry l. gantt |
C. | f.w. harris |
D. | elton mayo |
Answer» C. f.w. harris |
127. |
Human relations; the Hawthorne studies is developed by |
A. | frank b. gilbreth |
B. | henry l. gantt |
C. | f.w. harris |
D. | elton mayo |
Answer» D. elton mayo |
128. |
Statistical inference applied to product quality: quality control charts are contributed by |
A. | w.a. shewart |
B. | h.f.dodge&h.g.roming |
C. | p.m.blacker& others |
D. | john mauchlly and j.p.eckert |
Answer» A. w.a. shewart |
129. |
Inspection sampling plans is developed by |
A. | w.a. shewart |
B. | h.f.dodge&h.g.roming |
C. | p.m.blacker& others |
D. | john mauchlly and j.p.eckert |
Answer» B. h.f.dodge&h.g.roming |
130. |
Operations research applications in world war II is contributed by |
A. | w.a. shewart |
B. | h.f.dodge&h.g.roming |
C. | p.m.blacker& others |
D. | john mauchlly and j.p.eckert |
Answer» C. p.m.blacker& others |
131. |
Digital Computer is associated with |
A. | w.a. shewart |
B. | h.f.dodge&h.g.roming |
C. | p.m.blacker& others |
D. | john mauchlly and j.p.eckert |
Answer» D. john mauchlly and j.p.eckert |
132. |
Which of the following is not an input in production system |
A. | men |
B. | material |
C. | money |
D. | competition |
Answer» D. competition |
133. |
Which of the following is a part of production system? |
A. | input |
B. | output |
C. | transformation process |
D. | all of these |
Answer» D. all of these |
134. |
Operations management is part of |
A. | management science |
B. | natural science |
C. | (a) and (b) |
D. | none of these |
Answer» A. management science |
135. |
Resources are in the form of………… |
A. | human |
B. | material |
C. | capital |
D. | all of these |
Answer» D. all of these |
136. |
Which one of the following is not a part of production planning and control? |
A. | follow-up |
B. | financial leverage |
C. | routing |
D. | scheduling |
Answer» B. financial leverage |
137. |
Which one of the following is not an objective of materials management? |
A. | to minimise material cost. |
B. | to purchase, receive, transport and store materials efficiently. |
C. | to reduce material costs through simplification, standardisation |
D. | to fix cash dividend |
Answer» D. to fix cash dividend |
138. |
Which one of the following is an objective of maintenance management? |
A. | to reduce breakdown of machineries |
B. | to keep the machines and other facilities in a good condition. |
C. | to keep the plant in good working condition |
D. | all of these |
Answer» D. all of these |
139. |
Operation management department has interaction with |
A. | finance department |
B. | marketing department |
C. | (a) and (b) |
D. | none of these |
Answer» C. (a) and (b) |
140. |
Which of the following factors affect the choice of manufacturing process? |
A. | product characteristics |
B. | requirements of customers |
C. | availability of capital |
D. | all of these |
Answer» D. all of these |
141. |
Which of the following is a production system? |
A. | continuous system |
B. | intermittent system |
C. | project systems |
D. | all of these |
Answer» D. all of these |
142. |
Which of the following is incorrect in the case of job production? |
A. | more variety of products is manufactured as per customer’s requirements. |
B. | volume of production is large. |
C. | highly skilled employees are required who can take up each job as a challenge. |
D. | detailed planning is essential for sequencing the requirements of each product. |
Answer» B. volume of production is large. |
143. |
Which of the following is a part of product life cycle |
A. | introduction phase |
B. | growth phase |
C. | saturation phase |
D. | all of these |
Answer» D. all of these |
144. |
…………….is the process of careful step by step of dismantling of existing product in order to understand its unique underlying concepts |
A. | reverse engineering |
B. | civil engineering |
C. | (a) and (b) |
D. | none of these |
Answer» A. reverse engineering |
145. |
……………refers to the development of the concept or idea of a product in terms of specifications which are required for transforming the idea in to product |
A. | product design |
B. | product development |
C. | (a) and (b) |
D. | none of these |
Answer» A. product design |
146. |
………………….refers to the process of creating new products or modifying the existing ones within a predetermined time frame and cost price |
A. | product design |
B. | product development |
C. | market development |
D. | none of these |
Answer» B. product development |
147. |
Which of the following technique is employed for measuring work |
A. | time study |
B. | work sampling |
C. | predetermined motion time studies |
D. | all of these |
Answer» D. all of these |
148. |
…………………is the process of determining which job to start first and in what order other jobs should be processed on the machine or in work centre |
A. | job sequencing |
B. | priority rules |
C. | batch production |
D. | none of these |
Answer» A. job sequencing |
149. |
Which of the following factors affect capacity planning? |
A. | type of product |
B. | type of process |
C. | skill level of workers |
D. | all of these |
Answer» D. all of these |
150. |
Which of the following is an objective of scheduling? |
A. | meet due dates |
B. | minimise lead time |
C. | minimise setup time and set up cost |
D. | all of these |
Answer» D. all of these |
151. |
……………….is a time table for performing activities utilizing resources or allocating activities |
A. | scheduling |
B. | engineering |
C. | reporting |
D. | communication |
Answer» A. scheduling |
152. |
……………………..starts from some data in the future and schedules the required operations in reverse sequence |
A. | scheduling |
B. | backward scheduling |
C. | forward scheduling |
D. | all of these |
Answer» B. backward scheduling |
153. |
In this sampling plan, the inspection results of two sample sizes are used to decide whether to accept or reject the complete lot. |
A. | single sampling plan |
B. | double sampling plan |
C. | questionnaire |
D. | census investigation |
Answer» B. double sampling plan |
154. |
Which of the following is a part of cost of quality? |
A. | prevention cost |
B. | appraisal cost |
C. | failure cost |
D. | all of these |
Answer» D. all of these |
155. |
Which of the following is an objective of quality assurance? |
A. | to improve quality |
B. | to reduce cost |
C. | to increase productivity |
D. | all of these |
Answer» D. all of these |
156. |
Which of the following is material handling equipment? |
A. | hand truck |
B. | pulley blocks |
C. | conveyors |
D. | all of these |
Answer» D. all of these |
157. |
Which of the following is a way of codification? |
A. | numerical code |
B. | mnemonic code |
C. | alpha-numeric code |
D. | all of these |
Answer» D. all of these |
158. |
The process of buying large quantities of items when its price is low so that tentative profits can be obtained by selling them at higher prices is called…………….. |
A. | speculative purchasing |
B. | group purchasing |
C. | tender purchasing |
D. | none of these |
Answer» A. speculative purchasing |
159. |
Which of the following is a function of purchasing department? |
A. | receive purchase requisition |
B. | supplier selection |
C. | order placement |
D. | all of these |
Answer» D. all of these |
160. |
……………………….is the quantity that should be carried by the company so that production is not affected before the next deliver arrives. |
A. | minimum stock level |
B. | maximum stock level |
C. | re order level |
D. | all of these |
Answer» A. minimum stock level |
161. |
VED Analysis is related with |
A. | materials |
B. | spare parts |
C. | labour |
D. | overheads |
Answer» B. spare parts |
162. |
Which of the following cost is associated with inventories? |
A. | carrying cost |
B. | ordering cost |
C. | over stocking cost |
D. | all of these |
Answer» D. all of these |
163. |
Which of the following factor affects the choice of the plant location selection decision? |
A. | capital requirement. |
B. | government policy |
C. | climate conditions |
D. | all of these |
Answer» D. all of these |
164. |
Locating the plant nearer to the market is preferred if: |
A. | the products are subject to spoilage. |
B. | after sales services are promptly required very often. |
C. | (a) and (b) |
D. | none of these |
Answer» C. (a) and (b) |
165. |
Which of the following is theobjective of plant layout |
A. | streamline the flow of materials through the plant. |
B. | facilitate the manufacturing process. |
C. | minimise materials handling cost. |
D. | all of these |
Answer» D. all of these |
166. |
Industrial buildings may be grouped under |
A. | single-storey buildings, |
B. | multi-storey buildings |
C. | (a) and (b) |
D. | none of these |
Answer» C. (a) and (b) |
167. |
Which of the following is not an advantage of single story building? |
A. | there is a greater flexibility in layout. |
B. | expansion is easily ensured by the removal of walls. |
C. | low cost of transportation and material handling charges |
D. | more land is required for building construction |
Answer» D. more land is required for building construction |
168. |
Which of the following is not a limitation of multi-story building? |
A. | materials handling becomes very complicated. |
B. | a lot of floor space is wasted on elevators, stairways and fire escapes. |
C. | natural lighting is poor |
D. | less land is required |
Answer» D. less land is required |
169. |
Which of the following is not a quality of good plant layout? |
A. | to reduce material handling cost |
B. | to provide enough production facility |
C. | to reduce labour efficiency |
D. | to provide ease of supervision |
Answer» C. to reduce labour efficiency |
170. |
Which of the following is not anobjective of good plant layout? |
A. | to improve productivity |
B. | to provide safety to employees |
C. | toincrease the number of accidents |
D. | to provide easy supervision |
Answer» C. toincrease the number of accidents |
171. |
Which of the following is not an objective of MRP? |
A. | reduction in inventory cost |
B. | meeting delivery schedule |
C. | improve the performance of production |
D. | to decrease production efficiency |
Answer» D. to decrease production efficiency |
172. |
Which of the following is not an Objective of material handling? |
A. | to reduce material handling cost |
B. | to increase production life cycle |
C. | better control of the flow of material |
D. | to ensure safety in the movement of goods |
Answer» B. to increase production life cycle |
173. |
Which of the following is not aRule for material handling? |
A. | make handling distances as short as possible |
B. | use right method and proper material handling |
C. | promote wasteful material handling methods |
D. | use mechanical equipment’s wherever it is useful |
Answer» C. promote wasteful material handling methods |
174. |
Which of the following is a Rule for material handling? |
A. | make handling distances as short as possible |
B. | use right method and proper material handling |
C. | eliminate wasteful material handling methods |
D. | all of these |
Answer» D. all of these |
175. |
Which of the following is the objective of motion study? |
A. | to eliminate all non-productive and ineffective motions. |
B. | to develop more effective and productive patterns of movements |
C. | (a) and (b) |
D. | none |
Answer» C. (a) and (b) |
176. |
Which of the following is not atechnique of work measurement |
A. | time study |
B. | amalgamation |
C. | work sampling |
D. | . predetermined motion and time study |
Answer» B. amalgamation |
177. |
Which of the following is a ProductionPlanning? |
A. | factory planning, |
B. | process planning |
C. | operation planning |
D. | all of these |
Answer» D. all of these |
178. |
In ……………………. the operations are located and the sequence of these operations in the production is determined |
A. | factory planning, |
B. | process planning |
C. | operation planning |
D. | none of these |
Answer» B. process planning |
179. |
………………..is concerned with planning the details of the methods required to perform each operation |
A. | factory planning, |
B. | process planning |
C. | operation planning |
D. | none of these |
Answer» C. operation planning |
180. |
………… is the art and science of ensuring that all which occurs is in accordance with the rules established and the instructions issued |
A. | operational plan |
B. | operational policy |
C. | operational mission |
D. | operational control |
Answer» D. operational control |
181. |
Dispatch provides official authorization for |
A. | movement of materials to different work stations, |
B. | movement of tools and fixtures necessary for each operation, |
C. | beginning of work on each operation, |
D. | all of these |
Answer» D. all of these |
182. |
Which of the following is not an objective of quality circle? |
A. | to improve quality |
B. | to improve productivity |
C. | employee retrenchment |
D. | . none of these |
Answer» C. employee retrenchment |
183. |
Which of the following is not a principles’ of TQM? |
A. | customer focus |
B. | continuous improvement |
C. | team approach |
D. | producer focus |
Answer» D. producer focus |
184. |
Which one of the following is not an objective of materials management? |
A. | to maximise material cost. |
B. | to purchase, receive, transport and store materials efficiently. |
C. | to reduce material costs through simplification, standardisation |
D. | to minimise material cost |
Answer» A. to maximise material cost. |
185. |
Which one of the following is not an objective of maintenance management? |
A. | to reduce breakdown of machineries |
B. | to keep the machines and other facilities in a bad condition. |
C. | to keep the plant in good working condition |
D. | all of these |
Answer» B. to keep the machines and other facilities in a bad condition. |
186. |
Which of the following is not a characteristic of intermittent production system? |
A. | the flow of production is intermittent. |
B. | the volume of production is generally small. |
C. | a single product is manufactured in bulk. |
D. | none of these |
Answer» C. a single product is manufactured in bulk. |
187. |
Which of the following is an input in manufacturing system? |
A. | capital |
B. | material |
C. | human resource |
D. | all of these |
Answer» D. all of these |
188. |
Which of the following is not a part of production system? |
A. | input |
B. | output |
C. | transformation process |
D. | politics |
Answer» D. politics |
189. |
Which of the following is not a part of product life cyclestage? |
A. | introduction phase |
B. | competition phase |
C. | maturity and saturation phase |
D. | none of these |
Answer» B. competition phase |
190. |
Which of the following is not an objective of quality assurance? |
A. | to reduce the quality |
B. | to reduce cost |
C. | to increase productivity |
D. | all of these |
Answer» A. to reduce the quality |
191. |
Which of the following is not a function of purchasing department? |
A. | receive purchase requisition |
B. | supplier selection |
C. | order placement |
D. | employee selection |
Answer» D. employee selection |
192. |
Which of the following is not the objective of plant layout? |
A. | streamline the flow of materials through the plant. |
B. | facilitate the manufacturing process. |
C. | enhance materials handling cost. |
D. | none of these |
Answer» C. enhance materials handling cost. |
193. |
Which of the following is not an objective of operation management? |
A. | to reduce product quality |
B. | to reduce cost of production |
C. | material cost control |
D. | none of these |
Answer» A. to reduce product quality |
194. |
Which of the following is not an objective of quality control? |
A. | to produce qualitative items |
B. | to reduce companies cost through reduction of losses due to defects. |
C. | toenhance quality variation among same product category. |
D. | none of these |
Answer» C. toenhance quality variation among same product category. |