

McqMate
These multiple-choice questions (MCQs) are designed to enhance your knowledge and understanding in the following areas: Computer Science Engineering (CSE) , Information Technology Engineering (IT) , Bachelor of Science in Computer Science TY (BSc CS) , Bachelor of Science in Information Technology TY (BSc IT) , Bachelor of Science in Information Technology (BSc IT) .
301. |
Executing the same test case by giving the number of inputs on same build called as |
A. | regression testing |
B. | retesting |
C. | ad hoc testing |
D. | sanity testing |
Answer» B. retesting |
302. |
Control Charts is a statistical technique to assess, monitor, and maintain the stability of a process. |
A. | true |
B. | false |
Answer» A. true |
303. |
To check whether we are developing the right product according to the customer requirements are not. It is a static process |
A. | validation |
B. | verification |
C. | quality assurance |
D. | quality control |
Answer» B. verification |
304. |
To check whether we have developed the product according to the customer requirements r not. It is a Dynamic process. |
A. | validation |
B. | verification |
C. | quality assurance |
D. | quality control |
Answer» A. validation |
305. |
Staff development plan describes how the skills and experience of the project team members will be developed. |
A. | true |
B. | false |
Answer» A. true |
306. |
It is a set of levels that defines a testing maturity hierarchy |
A. | tim (testing improving model) |
B. | tmm (testing maturity model) |
C. | tqm(total quality management) |
Answer» B. tmm (testing maturity model) |
307. |
A Non-Functional Software testing done to check if the user interface is easy to use and understand |
A. | usability testing |
B. | security testing |
C. | unit testing |
D. | block box testing |
Answer» A. usability testing |
308. |
The review and approved document (i.e. Test plan, System Requirement Specification’s) is called as |
A. | delivery document |
B. | baseline document |
C. | checklist |
Answer» B. baseline document |
309. |
What are the Testing Levels? |
A. | unit testing |
B. | integration testing |
C. | system testing and acceptance testing. |
D. | all the above |
Answer» D. all the above |
310. |
Cost of quality = Prevention Cost + Appraisal cost + Failure cost |
A. | true |
B. | false |
Answer» A. true |
311. |
A useful tool to visualize, clarify, link, identify, and classify possible cause of a problem. This is also called as “fishbone diagram” what is this? |
A. | pareto analysis |
B. | cause-and-effect diagram |
Answer» B. cause-and-effect diagram |
312. |
It measures the quality of processes used to create a quality product. It is a system of management activities, It is a preventive process, It applies for entire life cycle & Deals with Process. |
A. | validation |
B. | verification |
C. | quality assurance |
D. | quality control |
Answer» C. quality assurance |
313. |
Variance from product specifications is called? |
A. | report |
B. | requirement |
C. | defect |
Answer» C. defect |
314. |
Verification is |
A. | process based |
B. | product based |
Answer» A. process based |
315. |
White box testing is not called as___________ |
A. | glass box testing |
B. | closed box testing |
C. | open box testing |
D. | clear box testing |
Answer» B. closed box testing |
316. |
Name the events that will be analyzed, Count the named incidents, Rank the count by frequency using a bar chart & Validate reasonableness of the analysis is called as |
A. | pareto analysis |
B. | cause and effect diagram |
C. | swot analysis |
D. | pie charts |
Answer» A. pareto analysis |
317. |
Retesting of a single program or component after a change has been made? |
A. | full regression testing |
B. | unit regression |
C. | regional regression |
D. | retesting |
Answer» B. unit regression |
318. |
Requirement and Analysis, Design, Development or Coding, Testing and Maintenance is called as Software Development Life Cycle (SDLC) |
A. | true |
B. | false |
Answer» A. true |
319. |
The testing which is done by going thro' the code is known as, |
A. | unit testing |
B. | blackbox testing |
C. | white box testing |
D. | regression testing |
Answer» C. white box testing |
320. |
Configuration Management Plan describes the Configuration Management procedures and structures to be used. |
A. | true |
B. | false |
Answer» A. true |
321. |
This type of testing method attempts to find incorrect or missing functions, errors in data structures or external database access, interface errors, Performance errors and initialization and Termination errors. It is called as |
A. | white box testing |
B. | grey box testing |
C. | black box testing |
D. | open box testing |
Answer» C. black box testing |
322. |
Phase Definition. It will come under |
A. | cmm level 1 |
B. | cmm level 2 |
C. | none |
Answer» B. cmm level 2 |
323. |
Software testing which is done without planning and Documentation is known as |
A. | adhoc testing |
B. | unit testing |
C. | regression testing |
D. | functional testing. |
Answer» A. adhoc testing |
324. |
Acceptance testing is known as |
A. | beta testing |
B. | greybox testing |
C. | test automation |
D. | white box testing |
Answer» A. beta testing |
325. |
Retesting the entire application after a change has been made called as? |
A. | full regression testing |
B. | unit regression |
C. | regional regression |
D. | retesting |
Answer» A. full regression testing |
326. |
Boundary value analysis belongs to which testing method? |
A. | black box testing |
B. | white box testing |
Answer» A. black box testing |
327. |
It measures the quality of a product It is a specific part of the QA procedure, It is a corrective process, It applies for particular product & Deals with the product. |
A. | validation |
B. | verification |
C. | quality assurance |
D. | quality control |
Answer» D. quality control |
328. |
What are the Types of Integration Testing? |
A. | big bang testing |
B. | bottom up testing |
C. | top down testing |
D. | all the above |
Answer» D. all the above |
329. |
Product Risk affects The quality or performance of the software. |
A. | true |
B. | false |
Answer» A. true |
330. |
A metric used to measure the characteristic of documentation and code called as |
A. | process metric |
B. | product metric |
C. | test metrics |
Answer» B. product metric |
331. |
Which is non-functional software testing? |
A. | unit testing |
B. | block box testing |
C. | performance testing |
D. | regression testing |
Answer» C. performance testing |
332. |
The process that deals with the technical and management issues of software development called as? |
A. | delivery process |
B. | testing process |
C. | software process |
Answer» C. software process |
333. |
Executing the same test case on a modified build called as |
A. | regression testing |
B. | retesting |
C. | ad hoc testing |
D. | sanity testing |
Answer» A. regression testing |
334. |
Which is Black-Box Testing method? |
A. | equivalence partitioning |
B. | code coverage |
C. | fault injection |
Answer» A. equivalence partitioning |
335. |
Business Risk affects The Organization developing or Procuring the software. |
A. | true |
B. | false |
Answer» A. true |
336. |
Stratification is a Technique used to analyze/divide a universe of data into homogeneous groups(stratA.. |
A. | true |
B. | false |
Answer» A. true |
337. |
Informing to the developer which bug to be fix first is called as |
A. | severity |
B. | priority |
C. | fix ability |
D. | traceability |
Answer» B. priority |
338. |
Software Testing is a process of evaluating a system by manual or automatic means and verify that it satisfies specified requirements or identity differences between expected and actual results. |
A. | true |
B. | false |
Answer» A. true |
339. |
Retesting modules connected to the program or component after a change has been made? |
A. | full regression testing |
B. | unit regression |
C. | regional regression |
D. | retesting. |
Answer» C. regional regression |
340. |
An Important metric is the number of defects found in internal testing compared to the defects found in customer tests, Status of test activities against the plan, Test coverage achieved so far, comes under |
A. | process metric |
B. | product metric |
C. | test metric |
Answer» C. test metric |
341. |
Alpha testing will be done at, |
A. | user\s site |
B. | developers\ site |
Answer» B. developers\ site |
342. |
SPICE Means |
A. | software process improvement and capability determination |
B. | software process improvement and compatibility determination. |
C. | software process invention and compatibility determination. |
D. | software process improvement and control determination |
Answer» A. software process improvement and capability determination |
343. |
It provides a set of levels and an assessment model, and presents a set of recommended practices that allow organizations to improve their testing processes. |
A. | tim (testing improving model) |
B. | tmm (testing maturity model) |
C. | tqm(total quality management) |
Answer» A. tim (testing improving model) |
344. |
Standards and procedures for managing changes in an evolving software product is called? |
A. | confirmation management |
B. | confederation mangement |
C. | configuration management |
D. | compartability management |
Answer» C. configuration management |
345. |
Path Tested = Number of Path Tested / Total Number of Paths |
A. | true |
B. | false |
Answer» A. true |
346. |
This Testing Technique examines the basic program structure and it derives the test data from the program logic; Ensuring that all statements and conditions executed at least once. It is called as |
A. | block box testing |
B. | white box testing |
C. | grey box testing |
D. | closed box testing |
Answer» B. white box testing |
347. |
This type of test include, how well the user will be able to understand and interact with the system? |
A. | usability testing |
B. | user acceptance testing |
C. | alpha testing |
D. | beta testing. |
Answer» A. usability testing |
348. |
Defects generally fall into the following categories? |
A. | wrong |
B. | missing |
C. | extra |
D. | all the above |
Answer» D. all the above |
349. |
What is correct Software Process Cycle? |
A. | plan(p)------>check(c)------>act(a)----->do(d) |
B. | plan(p)------>do(d)------>check(c)----->act(a) |
C. | plan(p)------>do(d)------>act(a)----->check(c) |
Answer» B. plan(p)------>do(d)------>check(c)----->act(a) |
350. |
Conducted to validate that the application, database, and network they may be running on can handle projected volumes of users and data effectively. The test is conducted jointly by developers, testers, DBA’s and network associates after the system Testing called as |
A. | functional testing |
B. | stress/load testing |
C. | recovery testing |
D. | integration testing |
Answer» B. stress/load testing |
Done Studing? Take A Test.
Great job completing your study session! Now it's time to put your knowledge to the test. Challenge yourself, see how much you've learned, and identify areas for improvement. Don’t worry, this is all part of the journey to mastery. Ready for the next step? Take a quiz to solidify what you've just studied.