These multiple-choice questions (MCQs) are designed to enhance your knowledge and understanding in the following areas: Computer Science Engineering (CSE) , Information Technology Engineering (IT) , Bachelor of Science in Computer Science TY (BSc CS) , Bachelor of Science in Information Technology TY (BSc IT) , Bachelor of Science in Information Technology (BSc IT) .

351.

Maintenance Plan predicts the maintenance requirements of the system, maintenance costs and effort required

A. true
B. false
Answer» A. true
352.

Beta testing will be done by

A. developer
B. user
C. tester
Answer» B. user
353.

Validation plan describes the approach ,resources and schedule used for system validation

A. true
B. false
Answer» A. true
354.

Integration, It will come under

A. cmm level 1
B. cmm level 3
C. cmm level 2
D. none
Answer» B. cmm level 3
355.

Types of quality tools are Problem Identification Tools and Problem Analysis Tools.

A. true
B. false
Answer» A. true
356.

Which Software Development Life cycle model will require to start Testing Activities when starting development activities itself

A. water falls model
B. spiral model
C. v-model
D. linear model
Answer» C. v-model
357.

A metric used to measure the characteristic of the methods, Techniques and tools employed in developing, implementing and maintaining the software system called as

A. process metric
B. product metric
C. test metrics
Answer» A. process metric
358.

Check Sheet(Checklist. is considered a simple , but powerful statistical tool because it differentiates between two extremes.

A. true
B. false
Answer» A. true
359.

Application should be stable. Clear Design and Flow of the application is needed for Automation testing.

A. false
B. true
Answer» B. true
360.

Quality plan describes the quality procedures and standards that will be used in a project.

A. false
B. true
Answer» B. true
361.

How severely the bug is effecting the application is called as

A. severity
B. priority
C. fix ability
D. traceability
Answer» A. severity
362.

Project Risk affects The Schedule or Resources.

A. true
B. false
Answer» A. true
363.

The name of the testing which is done to make sure the existing features are not affected by new changes

A. recursive testing
B. whitebox testing
C. unit testing
D. regression testing
Answer» D. regression testing
364.

Management and Measurement, It will come under

A. cmm level 1
B. cmm level 3
C. cmm level 4
D. cmm level 2
Answer» C. cmm level 4
365.

AdHoc testing is a part of

A. unit testing
B. regression tesing
C. exploratory testing
D. performance testing
Answer» C. exploratory testing
366.

Cost of Production = Right The First time cost(RTF. + Cost of Quality.

A. true
B. false
Answer» A. true
367.

------------- means under what test environment(Hardware, software set up. the application will run smoothly

A. test bed
B. checkpoint
C. code walk through
D. checklist
Answer» A. test bed
368.

TQM represents

A. tool quality management
B. test quality manager
C. total quality management
D. total quality manager
Answer» C. total quality management
369.

Optimization, Defect Prevention, and Quality Control. Its come under the

A. cmm level 2
B. cmm level 3
C. cmm level 4
D. cmm level5
Answer» D. cmm level5
370.

Unit Testing will be done by

A. testers
B. end users
C. customer
D. developers
Answer» D. developers
371.

Beta testing will be done at

A. user place
B. developers place
Answer» A. user place
372.

A Plan to overcome the risk called as

A. migration plan
B. master plan
C. maintenance plan
D. mitigation plan
Answer» D. mitigation plan
373.

Which of the following is not included in failure costs?

A. rework
B. repair
C. failure mode analysis
D. none of the mentioned
Answer» D. none of the mentioned
374.

Which requirements are the foundation from which quality is measured?

A. hardware
B. software
C. programmers
D. none of the mentioned
Answer» B. software
375.

Which of the following is not a SQA plan for a project?

A. evaluations to be performed
B. amount of technical work
C. audits and reviews to be performed
D. documents to be produced by the sqa group
Answer» B. amount of technical work
376.

Degree to which design specifications are followed in manufacturing the product is called

A. quality control
B. quality of conformance
C. quality assurance
D. none of the mentioned
Answer» B. quality of conformance
377.

Which of the following is not an appraisal cost in SQA?

A. inter-process inspection
B. maintenance
C. quality planning
D. testing
Answer» C. quality planning
378.

Who identifies, documents, and verifies that corrections have been made to the software?

A. project manager
B. project team
C. sqa group
D. all of the mentioned
Answer» C. sqa group
379.

What is not included in prevention costs?

A. quality planning
B. formal technical reviews
C. test equipment
D. equipment calibration and maintenance
Answer» D. equipment calibration and maintenance
380.

Quality Management in software engineering is also known as

A. sqa
B. sqm
C. sqi
D. sqa and sqm
Answer» A. sqa
381.

Which of the following is not a core step of Six Sigma?

A. define
B. control
C. measure
D. analyse
Answer» B. control
382.

Non-conformance to software requirements is known as

A. software availability
B. software reliability
C. software failure
D. none of the mentioned
Answer» C. software failure
383.

What kind of quality cost is incurred when an error is detected in a product prior to shipment?

A. prevention
B. internal failure
C. external failure
D. appraisal
Answer» B. internal failure
384.

The degree to which the design specifications are followed during manufacturing is known as

A. quality of design
B. quality of conformance
C. quality of testing
D. none of the mentioned
Answer» B. quality of conformance
385.

Alpha testing is done at

A. developer‟s end
B. user‟s end
C. developer‟s & user‟s end
D. none of the mentioned
Answer» A. developer‟s end
386.

Exhaustive testing is

A. always possible
B. practically possible
C. impractical but possible
D. impractical and impossible
Answer» C. impractical but possible
387.

White Box techniques are also classified as

A. design based testing
B. structural testing
C. error guessing technique
D. none of the mentioned
Answer» B. structural testing
388.

Which of the following term describes testing?

A. finding broken code
B. evaluating deliverable to find errors
C. a stage of all projects
D. none of the mentioned
Answer» B. evaluating deliverable to find errors
389.

The testing in which code is checked

A. black box testing
B. white box testing
C. red box testing
D. green box testing
Answer» B. white box testing
390.

Acceptance testing is also known as

A. grey box testing
B. white box testing
C. alpha testing
D. beta testing
Answer» D. beta testing
391.

Which of the following is non-functional testing?

A. black box testing
B. performance testing
C. unit testing
D. none of the mentioned
Answer» B. performance testing
392.

Beta testing is done at

A. user‟s end
B. developer‟s end
C. user‟s & developer‟s end
D. none of the mentioned
Answer» A. user‟s end
393.

Unit testing is done by

A. users
B. developers
C. customers
D. none of the mentioned
Answer» B. developers
394.

Behavioral testing is

A. white box testing
B. black box testing
C. grey box testing
D. none of the mentioned
Answer» B. black box testing
395.

Which of the following is black box testing

A. basic path testing
B. boundary value analysis
C. code path analysis
D. none of the mentioned
Answer» B. boundary value analysis
396.

In which testing level the focus is on customer usage?

A. alpha testing
B. beta testing
C. validation testing
D. both alpha and beta
Answer» D. both alpha and beta
397.

What is normally considered as an adjunct to the coding step

A. integration testing
B. unit testing
C. completion of testing
D. regression testing
Answer» B. unit testing
398.

What is the main purpose of integration testing?

A. design errors
B. interface errors
C. procedure errors
D. none of the above
Answer» B. interface errors
399.

Testing of individual components by the developers are comes under which type of testing?

A. integration testing
B. validation testing
C. unit testing
D. none of the above
Answer» C. unit testing
400.

When the Testing Principles are useful while building the Software Product?

A. during testing
B. during execution
C. during review
D. throughout life-cycle
Answer» D. throughout life-cycle

Done Studing? Take A Test.

Great job completing your study session! Now it's time to put your knowledge to the test. Challenge yourself, see how much you've learned, and identify areas for improvement. Don’t worry, this is all part of the journey to mastery. Ready for the next step? Take a quiz to solidify what you've just studied.