McqMate
These multiple-choice questions (MCQs) are designed to enhance your knowledge and understanding in the following areas: Computer Science Engineering (CSE) , Information Technology Engineering (IT) , Bachelor of Science in Computer Science TY (BSc CS) , Bachelor of Science in Information Technology TY (BSc IT) , Bachelor of Science in Information Technology (BSc IT) .
| 351. |
Maintenance Plan predicts the maintenance requirements of the system, maintenance costs and effort required |
| A. | true |
| B. | false |
| Answer» A. true | |
| 352. |
Beta testing will be done by |
| A. | developer |
| B. | user |
| C. | tester |
| Answer» B. user | |
| 353. |
Validation plan describes the approach ,resources and schedule used for system validation |
| A. | true |
| B. | false |
| Answer» A. true | |
| 354. |
Integration, It will come under |
| A. | cmm level 1 |
| B. | cmm level 3 |
| C. | cmm level 2 |
| D. | none |
| Answer» B. cmm level 3 | |
| 355. |
Types of quality tools are Problem Identification Tools and Problem Analysis Tools. |
| A. | true |
| B. | false |
| Answer» A. true | |
| 356. |
Which Software Development Life cycle model will require to start Testing Activities when starting development activities itself |
| A. | water falls model |
| B. | spiral model |
| C. | v-model |
| D. | linear model |
| Answer» C. v-model | |
| 357. |
A metric used to measure the characteristic of the methods, Techniques and tools employed in developing, implementing and maintaining the software system called as |
| A. | process metric |
| B. | product metric |
| C. | test metrics |
| Answer» A. process metric | |
| 358. |
Check Sheet(Checklist. is considered a simple , but powerful statistical tool because it differentiates between two extremes. |
| A. | true |
| B. | false |
| Answer» A. true | |
| 359. |
Application should be stable. Clear Design and Flow of the application is needed for Automation testing. |
| A. | false |
| B. | true |
| Answer» B. true | |
| 360. |
Quality plan describes the quality procedures and standards that will be used in a project. |
| A. | false |
| B. | true |
| Answer» B. true | |
| 361. |
How severely the bug is effecting the application is called as |
| A. | severity |
| B. | priority |
| C. | fix ability |
| D. | traceability |
| Answer» A. severity | |
| 362. |
Project Risk affects The Schedule or Resources. |
| A. | true |
| B. | false |
| Answer» A. true | |
| 363. |
The name of the testing which is done to make sure the existing features are not affected by new changes |
| A. | recursive testing |
| B. | whitebox testing |
| C. | unit testing |
| D. | regression testing |
| Answer» D. regression testing | |
| 364. |
Management and Measurement, It will come under |
| A. | cmm level 1 |
| B. | cmm level 3 |
| C. | cmm level 4 |
| D. | cmm level 2 |
| Answer» C. cmm level 4 | |
| 365. |
AdHoc testing is a part of |
| A. | unit testing |
| B. | regression tesing |
| C. | exploratory testing |
| D. | performance testing |
| Answer» C. exploratory testing | |
| 366. |
Cost of Production = Right The First time cost(RTF. + Cost of Quality. |
| A. | true |
| B. | false |
| Answer» A. true | |
| 367. |
------------- means under what test environment(Hardware, software set up. the application will run smoothly |
| A. | test bed |
| B. | checkpoint |
| C. | code walk through |
| D. | checklist |
| Answer» A. test bed | |
| 368. |
TQM represents |
| A. | tool quality management |
| B. | test quality manager |
| C. | total quality management |
| D. | total quality manager |
| Answer» C. total quality management | |
| 369. |
Optimization, Defect Prevention, and Quality Control. Its come under the |
| A. | cmm level 2 |
| B. | cmm level 3 |
| C. | cmm level 4 |
| D. | cmm level5 |
| Answer» D. cmm level5 | |
| 370. |
Unit Testing will be done by |
| A. | testers |
| B. | end users |
| C. | customer |
| D. | developers |
| Answer» D. developers | |
| 371. |
Beta testing will be done at |
| A. | user place |
| B. | developers place |
| Answer» A. user place | |
| 372. |
A Plan to overcome the risk called as |
| A. | migration plan |
| B. | master plan |
| C. | maintenance plan |
| D. | mitigation plan |
| Answer» D. mitigation plan | |
| 373. |
Which of the following is not included in failure costs? |
| A. | rework |
| B. | repair |
| C. | failure mode analysis |
| D. | none of the mentioned |
| Answer» D. none of the mentioned | |
| 374. |
Which requirements are the foundation from which quality is measured? |
| A. | hardware |
| B. | software |
| C. | programmers |
| D. | none of the mentioned |
| Answer» B. software | |
| 375. |
Which of the following is not a SQA plan for a project? |
| A. | evaluations to be performed |
| B. | amount of technical work |
| C. | audits and reviews to be performed |
| D. | documents to be produced by the sqa group |
| Answer» B. amount of technical work | |
| 376. |
Degree to which design specifications are followed in manufacturing the product is called |
| A. | quality control |
| B. | quality of conformance |
| C. | quality assurance |
| D. | none of the mentioned |
| Answer» B. quality of conformance | |
| 377. |
Which of the following is not an appraisal cost in SQA? |
| A. | inter-process inspection |
| B. | maintenance |
| C. | quality planning |
| D. | testing |
| Answer» C. quality planning | |
| 378. |
Who identifies, documents, and verifies that corrections have been made to the software? |
| A. | project manager |
| B. | project team |
| C. | sqa group |
| D. | all of the mentioned |
| Answer» C. sqa group | |
| 379. |
What is not included in prevention costs? |
| A. | quality planning |
| B. | formal technical reviews |
| C. | test equipment |
| D. | equipment calibration and maintenance |
| Answer» D. equipment calibration and maintenance | |
| 380. |
Quality Management in software engineering is also known as |
| A. | sqa |
| B. | sqm |
| C. | sqi |
| D. | sqa and sqm |
| Answer» A. sqa | |
| 381. |
Which of the following is not a core step of Six Sigma? |
| A. | define |
| B. | control |
| C. | measure |
| D. | analyse |
| Answer» B. control | |
| 382. |
Non-conformance to software requirements is known as |
| A. | software availability |
| B. | software reliability |
| C. | software failure |
| D. | none of the mentioned |
| Answer» C. software failure | |
| 383. |
What kind of quality cost is incurred when an error is detected in a product prior to shipment? |
| A. | prevention |
| B. | internal failure |
| C. | external failure |
| D. | appraisal |
| Answer» B. internal failure | |
| 384. |
The degree to which the design specifications are followed during manufacturing is known as |
| A. | quality of design |
| B. | quality of conformance |
| C. | quality of testing |
| D. | none of the mentioned |
| Answer» B. quality of conformance | |
| 385. |
Alpha testing is done at |
| A. | developer‟s end |
| B. | user‟s end |
| C. | developer‟s & user‟s end |
| D. | none of the mentioned |
| Answer» A. developer‟s end | |
| 386. |
Exhaustive testing is |
| A. | always possible |
| B. | practically possible |
| C. | impractical but possible |
| D. | impractical and impossible |
| Answer» C. impractical but possible | |
| 387. |
White Box techniques are also classified as |
| A. | design based testing |
| B. | structural testing |
| C. | error guessing technique |
| D. | none of the mentioned |
| Answer» B. structural testing | |
| 388. |
Which of the following term describes testing? |
| A. | finding broken code |
| B. | evaluating deliverable to find errors |
| C. | a stage of all projects |
| D. | none of the mentioned |
| Answer» B. evaluating deliverable to find errors | |
| 389. |
The testing in which code is checked |
| A. | black box testing |
| B. | white box testing |
| C. | red box testing |
| D. | green box testing |
| Answer» B. white box testing | |
| 390. |
Acceptance testing is also known as |
| A. | grey box testing |
| B. | white box testing |
| C. | alpha testing |
| D. | beta testing |
| Answer» D. beta testing | |
| 391. |
Which of the following is non-functional testing? |
| A. | black box testing |
| B. | performance testing |
| C. | unit testing |
| D. | none of the mentioned |
| Answer» B. performance testing | |
| 392. |
Beta testing is done at |
| A. | user‟s end |
| B. | developer‟s end |
| C. | user‟s & developer‟s end |
| D. | none of the mentioned |
| Answer» A. user‟s end | |
| 393. |
Unit testing is done by |
| A. | users |
| B. | developers |
| C. | customers |
| D. | none of the mentioned |
| Answer» B. developers | |
| 394. |
Behavioral testing is |
| A. | white box testing |
| B. | black box testing |
| C. | grey box testing |
| D. | none of the mentioned |
| Answer» B. black box testing | |
| 395. |
Which of the following is black box testing |
| A. | basic path testing |
| B. | boundary value analysis |
| C. | code path analysis |
| D. | none of the mentioned |
| Answer» B. boundary value analysis | |
| 396. |
In which testing level the focus is on customer usage? |
| A. | alpha testing |
| B. | beta testing |
| C. | validation testing |
| D. | both alpha and beta |
| Answer» D. both alpha and beta | |
| 397. |
What is normally considered as an adjunct to the coding step |
| A. | integration testing |
| B. | unit testing |
| C. | completion of testing |
| D. | regression testing |
| Answer» B. unit testing | |
| 398. |
What is the main purpose of integration testing? |
| A. | design errors |
| B. | interface errors |
| C. | procedure errors |
| D. | none of the above |
| Answer» B. interface errors | |
| 399. |
Testing of individual components by the developers are comes under which type of testing? |
| A. | integration testing |
| B. | validation testing |
| C. | unit testing |
| D. | none of the above |
| Answer» C. unit testing | |
| 400. |
When the Testing Principles are useful while building the Software Product? |
| A. | during testing |
| B. | during execution |
| C. | during review |
| D. | throughout life-cycle |
| Answer» D. throughout life-cycle | |
Done Studing? Take A Test.
Great job completing your study session! Now it's time to put your knowledge to the test. Challenge yourself, see how much you've learned, and identify areas for improvement. Don’t worry, this is all part of the journey to mastery. Ready for the next step? Take a quiz to solidify what you've just studied.