222
79.4k

210+ Advanced Construction Technology Solved MCQs

These multiple-choice questions (MCQs) are designed to enhance your knowledge and understanding in the following areas: Civil Engineering .

151.

The pre-stressed concrete piles as compared to pre-cast and reinforced concrete piles

A. are lesser in weight
B. have high load carrying capacity
C. are extremely durable
D. all of these
Answer» D. all of these
152.

A steel pile which function more efficiently in soft clay or loose sand, is

A. H-pile
B. pipe pile
C. screw pile
D. disc pile
Answer» C. screw pile
153.

A screw pile consists of cast iron or steel shaft of external diameter varying from

A. 0 to 150 mm
B. 150 to 300 mm
C. 300 to 450 mm
D. 450 to 600 mm
Answer» B. 150 to 300 mm
154.

Sheet piles are made of

A. wood
B. steel
C. concrete
D. all of these
Answer» D. all of these
155.

The coefficient of friction between the concrete and soil is

A. 0.20 to 0.25
B. 0.25 to 0.30
C. 0.30 to 0.35
D. 0.35 to 0.50
Answer» C. 0.30 to 0.35
156.

When the depth of water is from 4.5 to 6 m, the type of cofferdam used is

A. earthen cofferdam
B. rock fill cofferdam
C. single-walled cofferdam
D. double walled cofferdam
Answer» C. single-walled cofferdam
157.

A watertight structure constructed in connection with excavations for piers is………

A. caisson
B. cofferdam
C. well foundation
D. raft foundation
Answer» A. caisson
158.

Which of the following is type of cofferdam?

A. Rock-filled crib cofferdam
B. Cellular cofferdam
C. Suspended cofferdam
D. All of the above
Answer» D. All of the above
159.

Which cofferdam is suitable at place where velocity of flow is slow & depth of water is 1.5m?

A. Rock-fill cofferdam
B. Earth-fill cofferdam
C. Rock-filled crib cofferdam
D. Cellular cofferdam
Answer» B. Earth-fill cofferdam
160.

Rockfill cofferdam can be construction up to _________ m water depth.

A. 3
B. 1.5
C. 4.5
D. 2
Answer» A. 3
161.

Which cofferdam can be used at a place where working space is limited and depth of water is about 4m?

A. Single walled cofferdam
B. Earth-fill cofferdam
C. Rock-filled crib cofferdam
D. Cellular cofferdam
Answer» C. Rock-filled crib cofferdam
162.

Which cofferdam uses frame made of wooden logs to provide desired shape to cofferdam ?

A. Single walled cofferdam
B. Earth-fill cofferdam
C. Rock-filled crib cofferdam
D. Cellular cofferdam
Answer» C. Rock-filled crib cofferdam
163.

Why sand bags are stacked inside single walled cofferdam?

A. To prevent water seepage
B. To resist uplift forces
C. To provide working platform
D. To improve stability
Answer» D. To improve stability
164.

Guide piles used in single walled cofferdam are made of which material?

A. Steel
B. Timber
C. Concrete
D. Composite Material
Answer» B. Timber
165.

Steel Sheet type double walled cofferdam is suitable at _________

A. Water depth up to 6 to 10m
B. To cover large area
C. When it is not possible to drive guide piles
D. All of the above
Answer» D. All of the above
166.

When large area consisting water depth up to 21m which cofferdam is suitable?

A. Double walled cofferdam
B. Concrete cofferdam
C. Cellular cofferdam
D. Rock-filled crib cofferdam
Answer» C. Cellular cofferdam
167.

Which type of deep foundation is preferred when large area is to be covered at greater depth?

A. Raft Foundation
B. Caisson
C. Coffer Dam
D. Pile Foundation
Answer» B. Caisson
168.

Which of the following is not a use of Caisson?

A. To reach hard bearing strata
B. To provide access to deep shaft or tunnel
C. To serve as temporary impervious boundary
D. For the excavation of foundation of piers
Answer» C. To serve as temporary impervious boundary
169.

Which of the following is not a type of caisson?

A. Box Caisson
B. Double Wall Caisson
C. Open Caisson
D. Pneumatic Caisson
Answer» B. Double Wall Caisson
170.

Which caisson is used when excavation is not required?

A. Box Caisson
B. Double Wall Caisson
C. Open Caisson
D. Pneumatic Caisson
Answer» A. Box Caisson
171.

Box caisson can be used up to depth _________ m.

A. 3
B. 1.5
C. 8
D. 12
Answer» C. 8
172.

Which of the following is not a type of Open Caisson?

A. Single Well
B. Semi-Circle
C. Monoliths
D. Cylinder
Answer» B. Semi-Circle
173.

Which of the following is a shape of well caisson?

A. Twin Hexagonal
B. Dumb Well
C. Double – D
D. All of the above
Answer» D. All of the above
174.

Which of the following is not a factor in choice of shape of wall?

A. Dimension of Pier or Abutment to be constructed
B. Cost of Sinking
C. Type of Soil at foundation
D. Vertical and Horizontal forces acting on well
Answer» C. Type of Soil at foundation
175.

Which shape of well is most suitable to avoid horizontal forces?

A. Single Circular Shape
B. Twin-Octagonal Shape
C. Rectangular Shape
D. Dumb well Shape
Answer» A. Single Circular Shape
176.

Which of the following is a component of well?

A. Cutting Edge
B. Steining
C. Bottom Plug
D. All of the above
Answer» D. All of the above
177.

Minimum thickness of steining should be _________ cm.

A. 30
B. 45
C. 25
D. 35
Answer» B. 45
178.

Pneumatic cassions used for a depth up to____________m.

A. 30
B. 45
C. 25
D. 35
Answer» D. 35
179.

Water is removed from pneumatic caisson using _________.

A. Pumping out of water
B. Passing pressurized air
C. Constructing double wall
D. None of the above
Answer» B. Passing pressurized air
180.

Maximum pressure of air inside pneumatic caisson is _______ N/mm2

A. 0.50
B. 0.25
C. 0.35
D. 0.30
Answer» C. 0.35
181.

Which are the sickness that cannot arise due to working in pneumatic caisson?

A. Dizziness
B. Diarrhea
C. Headache
D. Trouble in speaking
Answer» B. Diarrhea
182.

At which temperature caisson sickness can be avoided?

A. 32° C
B. 30° C
C. 25° C
D. 28° C
Answer» C. 25° C
183.

Which are the forces that acts on Caisson?

A. Seismic Forces
B. Dynamic Forces
C. Wind Forces
D. All of the above
Answer» D. All of the above
184.

Which of the following method is not used for Floating of Caisson?

A. Floating by Crane
B. Construction of dry dock
C. Turning of Caisson
D. Use of compressed air
Answer» A. Floating by Crane
185.

By which method caisson can be sunk into hard rock?

A. Air and Water Jets
B. Blasting
C. Loading
D. Sand Island
Answer» B. Blasting
186.

Why sand island method of sinking of caisson is used?

A. To prevent floating
B. To prevent tilting
C. To stabilize caisson
D. To prevent overturning
Answer» C. To stabilize caisson
187.

Which are the problems that can arise during well sinking?

A. Sand blowing
B. Tilting of wells
C. Shifting of wells
D. All of the above
Answer» D. All of the above
188.

Which of these problems can occur during de-watering of well?

A. Sand blowing
B. Tilting of wells
C. Shifting of wells
D. All of the above
Answer» A. Sand blowing
189.

Tilting of well during sinking can occur due to _________ .

A. Eccentric Loading
B. Water Jetting
C. Use of Explosive
D. All of the above
Answer» D. All of the above
190.

The temporary casing is known as the ______

A. support
B. Formwork
C. Builtup
D. casing
Answer» B. Formwork
191.

Forms whose components can be reused several times are known as the ______

A. strippling
B. panel forms
C. nevel forms
D. shuttering
Answer» B. panel forms
192.

The ______ of formwork plays an significant role in the cost of concrete.

A. Economy
B. conditions
C. work
D. period
Answer» A. Economy
193.

The inside surface of formwork should be ________ so as to turn out a good concrete surface.

A. Smooth
B. Undulated
C. Rough
D. Geometrical
Answer» A. Smooth
194.

The _______ formwork is used for formwork when it is desired to reuse the formwork several times.

A. wooden
B. Steel
C. Timber
D. None
Answer» B. Steel
195.

The column formwork consists of a box prepared from ______ separate sides.

A. One
B. Two
C. Three
D. Four
Answer» C. Three
196.

The form work for an RCC floor consists of a ________ to receive the concrete.

A. Beam
B. Block
C. Trap
D. Skeleton
Answer» D. Skeleton
197.

In formwork for wall, the _____ are provided by vertical Struts and horizontal wales.

A. Studs
B. Wales
C. Sheets
D. Ties
Answer» C. Sheets
198.

_______gives excellent exposed concrete surface requiring no further finishing treatment.

A. Steel
B. Timber
C. Wood
D. Fibre Glass
Answer» A. Steel
199.

When form work is required for small ones requiring fewer repetitions, the ________ is preferred to Steel.

A. Steel
B. Timber
C. Fibre Glass
D. Metal Sheets
Answer» B. Timber
200.

It is found that a moisture content of about ______ is appropriate for the timber formwork.

A. 20%
B. 30%
C. 40%
D. 50%
Answer» A. 20%

Done Studing? Take A Test.

Great job completing your study session! Now it's time to put your knowledge to the test. Challenge yourself, see how much you've learned, and identify areas for improvement. Don’t worry, this is all part of the journey to mastery. Ready for the next step? Take a quiz to solidify what you've just studied.