109
78.2k

510+ Total Quality Management (TQM) Solved MCQs

These multiple-choice questions (MCQs) are designed to enhance your knowledge and understanding in the following areas: Mechanical Engineering , Electronics and Communication Engineering .

151.

The x bar chart monitors:

A. Between sample variability
B. Within sample variability
C. Instantaneous variability
D. Natural variability
Answer» A. Between sample variability
152.

In case someone is interested in process standard deviation, he should construct the ______________ chart.

A. X bar
B. R chart
C. S chart
D. None of the above
Answer» C. S chart
153.

If data for MR chat shows non-normality, it is better to determine the control limits for the individuals control chart based on the ______________ of the correct underlying distribution.

A. Percentage
B. Percentiles
C. Rank
D. Mean
Answer» B. Percentiles
154.

A sample of size 10 contains 50 non-conformities. The average number of non-conformities is:

A. 7
B. 4
C. 5 (50/10 i.e. total non-conformities/sample size)
D. 1
Answer» C. 5 (50/10 i.e. total non-conformities/sample size)
155.

When the number of defects is low, which of the following is true:

A. We should use c or u chart
B. Most samples will have non-zero defects
C. Create a time between occurrence control chart
D. None of the above
Answer» C. Create a time between occurrence control chart
156.

Bias reflects the:

A. The differences in observed accuracy and/or precision experienced over the range of measurements made by the system.
B. The difference between observed measurements and a "true" value obtained from a master or gold standard
C. Different levels of variability in different operating regimes, resulting from warm-up effects, environmental factors, inconsistent operator performance
D. None of the above
Answer» B. The difference between observed measurements and a "true" value obtained from a master or gold standard
157.

If variability of a product decreases, its quality ______________

A. remains unchanged
B. decreases
C. increases
D. may increase or decrease
Answer» C. increases
158.

The focal point of all quality control should be:

A. Price focus
B. Cost Focus
C. Customer Focus
D. Manufacturing Focus
Answer» C. Customer Focus
159.

The key process input variables (KPIV) and key process output variables are developed during the ______________ phase.

A. Define
B. Analyze
C. Measure
D. Improve
Answer» C. Measure
160.

An unbiased dice is rolled once. The probability of getting a number greater than 4 is:

A. ¼
B. 1/6
C. ½
D. 1/3
Answer» D. 1/3
161.

Which of the following statement is false:

A. Important step of strategic quality management is identification of those dimensions in which the organization will compete
B. Selection of suppliers should be based on quality, schedule, and cost, rather than on cost alone
C. All of the individuals in the organization must have an understanding of the basic tools of quality improvement
D. Manufacturing Unit should be the unit focusing on Quality Improvement among all units in an organization
Answer» D. Manufacturing Unit should be the unit focusing on Quality Improvement among all units in an organization
162.

Cause and Effect Diagram can be used in the ____ and ____ step of DMAIC.

A. Define, Measure
B. Analyze, Control
C. Analyze, Improve
D. Define, Improve
Answer» C. Analyze, Improve
163.

Which of the following is false regarding when acceptance sampling is useful:

A. When testing is destructive
B. When 100% inspection cost is very low
C. When there are potentially serious product liability risk
D. When 100% inspection is not technically feasible
Answer» B. When 100% inspection cost is very low
164.

Let p0 be the incoming fraction defective and p1 be the outgoing fraction defective (Assume both p1 and p0 is greater than 0). If rectifying inspection is performed then:

A. P0<p1
B. P1<p0
C. None of the above
D. Cannot be determined
Answer» B. P1<p0
165.

A company wants to measure the length of a fan as a part of its quality control exercise. The type of data collected will be:

A. Variable
B. Attribute
C. Cannot be determined
D. None of the above
Answer» B. Attribute
166.

If only ______________ causes of variation are present, the output of a process forms a distribution that is table over time and is predictable.

A. Assignable
B. Non-Random
C. Natural
D. Cannot be said
Answer» C. Natural
167.

For an x bar chart, β risk can be defined as:

A. The probability of detecting the shift in process mean from μo (in control value) to μ1
B. The probability of not detecting the shift in process mean from μ0 (in control value) to μ1
C. The probability of detecting the shift in process range from μ0 (in control value) to μ1
D. The probability of not detecting the shift in process range from μ0 (in control value) to μ1
Answer» B. The probability of not detecting the shift in process mean from μ0 (in control value) to μ1
168.

Consider that for a process s bar (average standard deviation of 50 samples each of size 4) is found to be 10.04. The value of c4 (corresponding to sample size of .4) is .92. What is the estimated value of process standard deviation?

A. 10.91 (s bar/ c4 is an unbiased estimator of standard deviation)
B. 11.89
C. 12.67
D. 9.67
Answer» A. 10.91 (s bar/ c4 is an unbiased estimator of standard deviation)
169.

The basic assumption of calculating the control limits based on average sample size (for a p chart) will ______________ from/as those previously observed.

A. Greatly differ
B. Will be exactly the same
C. Not greatly differ
D. None of the above
Answer» C. Not greatly differ
170.

The g chart is the control chart for:

A. Average number of events
B. Total number of events
C. Mean number of events
D. None of the above
Answer» B. Total number of events
171.

Attribute charts may be used when:

A. Several characteristics can be jointly measured
B. When one particular quality characteristic is of importance
C. Specific information like process mean is required
D. None of the above
Answer» A. Several characteristics can be jointly measured
172.

The thickness of the blade of a fan is specified to lie between 4 cm and 6 cm. The length of the blades must lie between 10 cm and 20 cm. A fan blade randomly selected from a sample of 100 blades has a thickness of 5cm and a length of 21cm. The number of defect(s) the blade has is ______________.

A. One
B. Two
C. There is no defect
D. Three
Answer» A. One
173.

The probability of getting a multiple of 2 on throwing a dice once is:

A. 1/6
B. ¼
C. ½
D. 1/3
Answer» A. 1/6
174.

Inspection of incoming/outgoing items is an example of ______________.

A. Prevention Cost
B. Appraisal Cost
C. Internal Failure Cost
D. External Failure Cost
Answer» B. Appraisal Cost
175.

Four basic characteristics of an optimal process are:

A. Economy, efficiency, control, quality
B. Quality, Improvement, efficiency, productivity
C. Economy, efficiency, productivity, cost
D. Economy, efficiency, productivity, quality
Answer» D. Economy, efficiency, productivity, quality
176.

______________ diagram is used for identifying potential relationship between two variables.

A. Pareto
B. Ishikawa
C. Histogram
D. Scatter
Answer» D. Scatter
177.

Lots for acceptance sampling should be ______________ and ______________.

A. Homogeneous, Large
B. Heterogeneous, Small
C. Homogeneous, Small
D. Heterogeneous, Large
Answer» A. Homogeneous, Large
178.

The roof of house of quality shows the interrelationship between:

A. Functional Requirements
B. Design Attributes
C. Service Process
D. Manufacturing Process
Answer» B. Design Attributes
179.

X bar charts are uses to control the ______________ of a process.

A. Dispersion
B. Central tendency
C. None of the above
D. Both a and b
Answer» B. Central tendency
180.

Given that for the three samples, the value of R bar is .66 and value of d2 corresponding to three is1.128, what is the estimated standard deviation?

A. .43
B. .67
C. .58
D. .75
Answer» C. .58
181.

Given L=3 and p=.03, estimate the sample size that can be used for construction of a p chart.

A. 534
B. 321
C. 123
D. 291 ((1-p)∗L2/p gives us an estimate of sample size)
Answer» D. 291 ((1-p)∗L2/p gives us an estimate of sample size)
182.

The chart used for tracking number non-conforming is:

A. P
B. Np
C. X bar
D. None of the above
Answer» B. Np
183.

For a c chart, the OC curve plots the ______________ against ______________.

A. Probability of Type 2 error, true mean number of defects
B. Probability of Type 1 error, true mean number of defects
C. Probability of Type 1 error, true total number of defects
D. Probability of Type 2 error, true total number of defects
Answer» A. Probability of Type 2 error, true mean number of defects
184.

Identification of customers and listening to the Voice of Customer (VoC) are a part of:

A. Quality Assurance
B. Quality Planning
C. Quality Control and Improvement
D. Quality Execution
Answer» B. Quality Planning
185.

Ease of repair is associated with ______________ dimension of quality.

A. Serviceability
B. Performance
C. Durability
D. Perceived Quality
Answer» A. Serviceability
186.

SIPOC diagram, used for understanding the flow in a process is used in ______________ stage of DMAIC.

A. Define
B. Measure
C. Analyze
D. Improve
Answer» A. Define
187.

Two major components of fitness of use are Quality of Design and ______________.

A. Quality of Conformance
B. Quality of Service
C. Quality of Specification
D. none
Answer» A. Quality of Conformance
188.

For new product development, the chosen methodology should be

A. DMADV
B. DMAIC
C. Structured Design Methodology
D. DMIE
Answer» A. DMADV
189.

In DMAIC, redesigning of process to either remove bottlenecks or to reduce waste takes place in the ______________ stage.

A. Define
B. Measure
C. Improve
D. Control
Answer» C. Improve
190.

The critical path method determines the ______________ path from the beginning to the end of the project.

A. Shortest
B. Quickest
C. Longest
D. Middle
Answer» C. Longest
191.

The Operating characteristic curve shows the relationship between the probability of acceptance (on y axis) and ______________ (on x axis).

A. Proportion defective
B. Proportion acceptable
C. Number of lots
D. Size of lot
Answer» A. Proportion defective
192.

In a double sampling plan, let d1 be the number of defects in the first sample and d2 be the number of defects in the second sample. Let c2 be the acceptance number for both samples. The condition for rejection is:

A. D1+d2<c2
B. D1+d2>c2
C. D1∗d2>c2
D. D1∗d2<c2
Answer» B. D1+d2>c2
193.

While random variability in a system can be removed by ______________, non-random variability requires ______________.

A. Operator or management action, Improvement in the system
B. Improvement in the system, operator or management action
C. Statistical Quality Control, Quality Checks
D. None of the above
Answer» B. Improvement in the system, operator or management action
194.

The concept of rational sub group means that subgroups or samples be selected such that if assignable causes are present the chances for differences between subgroups will be ______________.

A. minimized
B. maximized
C. neutralized
D. optimized
Answer» B. maximized
195.

Q-Q plot is used to check:/p>

A. Normality of the dataset
B. Number of defects
C. Process mean
D. Process standard deviation
Answer» A. Normality of the dataset
196.

The OC curve provides a measure of the ______________ of the control chart.

A. Sensitivity
B. Duality
C. none
D. none
Answer» A. Sensitivity
197.

Which of the following is not a type of attribute chart?

A. P chart
B. C chart
C. U char
D. X bar chart
Answer» D. X bar chart
198.

The thickness of aluminum sheet is specified to be of 6±2 mm. The Upper Specification Limit and Lower Specification Limit for the sheet are:

A. 4mm, 8mm
B. 8mm, 4mm
C. 6mm, 8mm
D. 4mm, 6mm
Answer» B. 8mm, 4mm
199.

Failure Mode and Effects Analysis, which prioritizes different sources of error, is used in ______________ stage.

A. Define
B. Measure
C. Improve
D. Analyze
Answer» D. Analyze
200.

In a six sigma improvement project the least experienced individuals are:

A. Green Belt
B. Black belts
C. Red Belts
D. Master Black Belts
Answer» A. Green Belt

Done Studing? Take A Test.

Great job completing your study session! Now it's time to put your knowledge to the test. Challenge yourself, see how much you've learned, and identify areas for improvement. Don’t worry, this is all part of the journey to mastery. Ready for the next step? Take a quiz to solidify what you've just studied.