131
95.1k

460+ CAD-CAM and Automation Solved MCQs

These multiple-choice questions (MCQs) are designed to enhance your knowledge and understanding in the following areas: Mechanical Engineering .

Chapters

Chapter: Robotics and Automation
451.

The middle four digits of the Opitz classification system are ______

A. Form code
B. Secondary code
C. Supplementary code
D. Stationary code
Answer» C. Supplementary code
452.

The last four digits of the Opitz classification system are ______

A. Form code
B. Secondary code
C. Supplementary code
D. Stationary code
Answer» B. Secondary code
453.

Form code of the Opitz system is for_________

A. Design attributes
B. Manufacturing attributes
C. Production operation type & sequence
D. Maintenance flow
Answer» A. Design attributes
454.

Supplementary code of the Opitz system is for_________

A. Design attributes
B. Manufacturing attributes
C. Production operation type & sequence
D. Maintenance flow
Answer» B. Manufacturing attributes
455.

Secondary code of the Opitz system is for_________

A. Design attributes
B. Manufacturing attributes
C. Production operation type & sequence
D. Maintenance flow
Answer» C. Production operation type & sequence
456.

Digit 1 in Opitz system is for_________

A. Part class
B. Main shape
C. Rotational machining
D. Plane surface machining
Answer» A. Part class
457.

Digit 2 in Opitz system is for_________

A. Part class
B. Main shape
C. Rotational machining
D. Plane surface machining
Answer» B. Main shape
458.

Digit 3 in Opitz system is for_________

A. Part class
B. Main shape
C. Rotational machining
D. Plane surface machining
Answer» C. Rotational machining
459.

Digit 4 in Opitz system is for_________

A. Part class
B. Main shape
C. Rotational machining
D. Plane surface machining
Answer» D. Plane surface machining
460.

Digit 5 in Opitz system is for_________

A. Part class
B. Main shape
C. Additional holes, teeth and forming
D. Plane surface machining
Answer» C. Additional holes, teeth and forming
461.

Use computers for storage and retrieval of the data for the process plans are?

A. Lower-level strategies
B. Intermediate strategies
C. Higher-level strategies
D. Morden-level strategies
Answer» A. Lower-level strategies
462.

A use computer to automatically generate process plans is?

A. Lower-level strategies
B. Intermediate strategies
C. Higher-level strategies
D. Morden-level strategies
Answer» C. Higher-level strategies
463.

Which automation is suited for high production quantities

A. Flexible
B. Programmable
C. Fixed
D. All of above
Answer» C. Fixed
464.

Which manufacturing system is best suited for batch production

A. Flexible
B. Programmable
C. Fixed
D. All of above
Answer» B. Programmable
465.

--------is a manufacturing system in which sequence of operation is fixed by equipment configuration

A. Flexible
B. Programmable
C. Fixed
D. All of above
Answer» C. Fixed
466.

A company is producing 15000 mobiles annually. Determine production scale of company

A. Low Production
B. Medium Production
C. High Production
D. None
Answer» C. High Production
467.

Which one of the following statements is TRUE?

A. Teach pendant is used for lead-through teaching.
B. Teach pendant is used for manual teaching.
C. Teach pendant is used for off-line teaching of robots.
D. Teach pendant is not used in robot teaching.
Answer» B. Teach pendant is used for manual teaching.

Done Studing? Take A Test.

Great job completing your study session! Now it's time to put your knowledge to the test. Challenge yourself, see how much you've learned, and identify areas for improvement. Don’t worry, this is all part of the journey to mastery. Ready for the next step? Take a quiz to solidify what you've just studied.