140+ Construction Project Management Solved MCQs

101.

The notice inviting tender should published in minimum........ daily news paper

A. 3
B. 2
C. 4
D. 5
Answer» B. 2
102.

Who will sign the contract deed on behalf of government

A. Chief engineer
B. Superintendent engineer
C. Executive engineer
D. Head clerk
Answer» C. Executive engineer
103.

Who will draft contract agreement?

A. Chief engineer
B. Divisional head clerk
C. Executive engineer
D. None of the above
Answer» B. Divisional head clerk
104.

Which are the criteria to be checked for pre- qualification of contractor

A. Financial strength
B. Past five year experience
C. Technical personnel engaged
D. All of the above
Answer» D. All of the above
105.

How many envelops are required to submitted Tender form

A. 3
B. 1
C. 4
D. 2
Answer» C. 4
106.

Total no of grades for registration of contractor with governments are

A. 3
B. 5
C. 7
D. 4
Answer» C. 7
107.

Contract is terminated in case of

A. Slow progress and time limit exceeds
B. Work is not being executed as per specifications and instruction of EIC
C. Contractor tries to admit sub-contractor
D. All of the above
Answer» D. All of the above
108.

Form no .........is used for material at site account

A. 35
B. 28
C. 16
D. 9
Answer» A. 35
109.

Mobilization advance

A. Shall be 2 to 5 % of project cost.
B. Shall be 3 to 7 % of project cost.
C. Shall be 10 to 15 % of project cost.
D. Shall be 12 to 18 % of project cost.
Answer» A. Shall be 2 to 5 % of project cost.
110.

Stock account is cleared yearly while tools and plants account is cleared half yearly

A. TRUE
B. FALSE
C. none
D. all
Answer» B. FALSE
111.

PERT analysis is based upon

A. Optimistic time
B. Pessimistic time
C. Most likely time
D. All of the above
Answer» D. All of the above
112.

The time activity consumes in most adverse conditions is

A. Optimistic time
B. Pessimistic time
C. Most likely time
D. All of the above
Answer» B. Pessimistic time
113.

The time activity consumes in normal conditions is

A. Optimistic time
B. Pessimistic time
C. Most likely time
D. All of the above
Answer» C. Most likely time
114.

The difference between the total float and free float is called

A. Duration
B. Interfering float
C. Critical activity
D. None of the above
Answer» B. Interfering float
115.

The critical path is

A. The longest path of the network
B. The shortest path of the network
C. The average duration path of the network
D. None of the above
Answer» A. The longest path of the network
116.

The float of critical activity is always

A. Maximum
B. Minimum
C. Zero
D. None of the above
Answer» C. Zero
117.

A dummy activity in a network

A. Is represented by dotted line
B. Is an artificial activity
C. Does not consume time and resources
D. All of the above
Answer» D. All of the above
118.

Activity starts from

A. Head event
B. Tail event
C. Dual role event
D. None of the above
Answer» B. Tail event
119.

Which of the following is an activity

A. Excavation
B. Curing
C. Laying concrete
D. All of the above
Answer» D. All of the above
120.

Earliest start time of activity equals to

A. TE of tail event of an activity
B. TE of head event of an activity
C. Average time of TE of tail event and head event
D. None of the above
Answer» A. TE of tail event of an activity
121.

................is provided to safeguard scaffolding against overturning.

A. Standards
B. Inclined rackers
C. Put-logs
D. Rails
Answer» B. Inclined rackers
122.

Ladder leading to landing should be extended at least ....... meter above the landing

A. 1.2
B. 1.5
C. 1
D. 1.8
Answer» C. 1
123.

While using ladder one should not lean sideways more than......... cms.

A. 40
B. 60
C. 30
D. 45
Answer» C. 30
124.

Wooden ladders should be inspected at least........... a month.

A. Once
B. Twice
C. Three times
D. Four times
Answer» A. Once
125.

In sheds for ceiling works, ......................... scaffolding is economical.

A. Suspended
B. Needle
C. Ordinary
D. None of the above
Answer» A. Suspended
126.

The construction industry has accounted for about ............% of all deaths due to accident at place of work

A. 5
B. 20
C. 25
D. 30
Answer» B. 20
127.

For repair works at high level of multistoreyed buildings needle scaffolding is preferred

A. As it is more stable
B. As it looks better
C. As it will not obstruct traffic at ground level.
D. None of the above
Answer» C. As it will not obstruct traffic at ground level.
128.

PPE stands for

A. Personal protective equipment
B. Preferred protective equipment
C. Prohibited protective equipment
D. None of the above
Answer» A. Personal protective equipment
129.

For work at height one should use

A. Safety belt
B. Full body harness
C. none
D. all
Answer» B. Full body harness
130.

A good safety record can produce higher morale, productivity and stronger employee loyalty.

A. Right
B. Wrong
C. none
D. all
Answer» A. Right
131.

Who plays a crucial role in convincing the operating staff to adopt the change?

A. HRD manager
B. Junior engineer
C. Public relation officer
D. Supervisor
Answer» D. Supervisor
132.

Supervisor is at the lowest level of management

A. Right
B. Wrong
C. none
D. all
Answer» A. Right
133.

............. has 3 roles ;Trainer,Motivator and Facilitator

A. HRD manager
B. Junior engineer
C. Public relation officer
D. Supervisor
Answer» D. Supervisor
134.

HRD is mainly concerned with

A. Optimum stress
B. Optimum cost
C. Optimum duration
D. None of the above
Answer» A. Optimum stress
135.

Which one of the following is not a system of HRD

A. Optimization of resources system
B. Appraisal system
C. Carrier system
D. Training System
Answer» A. Optimization of resources system
136.

Human resource is a

A. Perishable resource
B. Dynamic resource
C. Both A and B
D. None of the above
Answer» C. Both A and B
137.

Human resource development (HRD) is a

A. Process
B. Previlege
C. Business cycle
D. None of the above
Answer» A. Process
138.

HRD is a process which progresses by

A. Proper management of resource
B. customer satisfaction
C. Time resource optimization
D. Performance appraisal,Counseling and training
Answer» D. Performance appraisal,Counseling and training
139.

MIS stands for

A. Management Innovation System
B. Management Information System
C. Management Interaction style
D. None of the above
Answer» B. Management Information System
140.

HRD stands for

A. Human resource development
B. Human resource design
C. Higher resource development
D. None of the above
Answer» A. Human resource development
141.

In one stack not more than.......... cement bags should be stored one above other.

A. 8
B. 10
C. 15
D. 12
Answer» D. 12
142.

The space between the walls and cement bags all-round should be at least......... cms.

A. 30
B. 50
C. 60
D. 40
Answer» A. 30
143.

EOQ stands for

A. Equal order quantity
B. Economic order quantity
C. Extra order quantity
D. None of the above
Answer» B. Economic order quantity
144.

Timber and plywood should be stacked separately.

A. Agree
B. Disagree
C. none
D. all
Answer» A. Agree
145.

In any construction project the material cost constitute about..... % of the total project cost.

A. 60
B. 25
C. 35
D. 45
Answer» A. 60
146.

While placing of concrete, it should not be dropped from more than .......m height.

A. 2
B. 1
C. 3
D. 4
Answer» B. 1
147.

The coarse aggregates of different sizes like 5 to 10 mm, 10 to 20 mm, 20 to 40 mm etc. should be stored in different piles.

A. Agree
B. Disagree
C. none
D. all
Answer» A. Agree
148.

Which of the following is not a principle of preparing job layout

A. Location of auditorium
B. Administrative block
C. Warehouses/godown
D. Entry and Exit
Answer» A. Location of auditorium
149.

Which of the following is not a purpose of making job layout

A. To develop human resources in organization
B. To save time of delivery of material
C. To safeguard material from wastage and theft
D. To keep lead minimum
Answer» A. To develop human resources in organization
Tags
  • Question and answers in Construction Project Management,
  • Construction Project Management multiple choice questions and answers,
  • Construction Project Management Important MCQs,
  • Solved MCQs for Construction Project Management,
  • Construction Project Management MCQs with answers PDF download