1. |
Brick walls are measured in sq. m if the thickness of the wall is |
A. | 10 cm |
B. | 15 cm |
C. | 20 cm |
D. | 30 cm |
Answer» A. 10 cm |
2. |
The brick work is not measured in cu m in case of |
A. | one or more than one brick wall |
B. | brick work in arches |
C. | reinforced brick work |
D. | half brick wall |
Answer» D. half brick wall |
3. |
The following item of earth work is not measured separately. |
A. | brick work |
B. | site clearance |
C. | plastering work |
D. | concrete work |
Answer» B. site clearance |
4. |
The measurement is not made in square meters in case of |
A. | d.p.c. (damp proof course) |
B. | form works |
C. | concrete jeffries |
D. | r.c. chhajja |
Answer» D. r.c. chhajja |
5. |
Pick up the incorrect statement from the following: |
A. | dimensions are measured to the nearest 0.01 m |
B. | areas are measured to the nearest 0.01 sq.m |
C. | cubic contents are measured to the nearest 0.1 cum |
D. | weights are measured to the nearest 0.001 tonnes |
Answer» C. cubic contents are measured to the nearest 0.1 cum |
6. |
The item of steel work which is measured in sq.m, is |
A. | collapsible gates |
B. | cement work |
C. | brick work |
D. | steel work |
Answer» A. collapsible gates |
7. |
The damp proof course (D.P.C.) is measured in |
A. | cub. m |
B. | sq. m |
C. | meters |
D. | rmt |
Answer» B. sq. m |
8. |
For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is |
A. | 0.90 m3 |
B. | 0.94 m3 |
C. | 0.98 m3 |
D. | 1.00 m3 |
Answer» B. 0.94 m3 |
9. |
According to ISI method of measurement, the order of the sequence is |
A. | length, breadth, height |
B. | breadth, length, height |
C. | height, length, breadth |
D. | breath, length, height |
Answer» A. length, breadth, height |
10. |
Carpet area does not include the area of |
A. | hall area |
B. | bath room and lavatory |
C. | bed room area |
D. | plot area |
Answer» B. bath room and lavatory |
11. |
The item of the brick structure measured in sq.m, is |
A. | reinforced brick work |
B. | broken glass coping |
C. | brick edging |
D. | brick work in arches |
Answer» B. broken glass coping |
12. |
The 'centre line method' is specially adopted for estimating |
A. | bridge buildings |
B. | rectangular buildings |
C. | steel buildings |
D. | earthen building |
Answer» B. rectangular buildings |
13. |
The order of Taking dimensions is |
A. | length, breadth, height |
B. | breadth, length, height |
C. | height, breadth, length |
D. | breadth, length, height |
Answer» A. length, breadth, height |
14. |
Pick up the item of work not included in the plinth area estimate |
A. | wall thickness |
B. | room area |
C. | w.c. area |
D. | courtyard area |
Answer» D. courtyard area |
15. |
If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by |
A. | mid-section formula |
B. | center line methods |
C. | long wall short wall methods |
D. | rate analysis methods |
Answer» A. mid-section formula |
16. |
In the mid-section formula |
A. | the mean depth is the average of depths of two consecutive sections |
B. | the area mean |
C. | same as prizmoidal formula |
D. | same as trapezoidal formula |
Answer» A. the mean depth is the average of depths of two consecutive sections |
17. |
The correct Prismoidal formula for volume is |
A. | d [first area + last area + Ʃ even area + 2 Ʃ odd areas] |
B. | d/3 [first area + last area + 4 Ʃ even area + 2 Ʃ odd areas] |
C. | d/3 [first area + last area + 2 Ʃ even area + 4 Ʃ odd areas] |
D. | d/6 [first area + last area + 2 Σ even area + 4 Σ odd areas] |
Answer» B. d/3 [first area + last area + 4 Ʃ even area + 2 Ʃ odd areas] |