The critical activity has
Q.
The critical activity has
A.
Maximum float
B.
Minimum float
C.
Zero float
D.
None of these
Answer» C. Zero float
1.8k
0
Do you find this helpful?
4
View all MCQs in
Construction Management
Discussion
No comments yet
Login to comment
Related MCQs
The artificial activity which indicates that an activity following it, cannot be started unless the preceding activity is complete, is known as
If t is the duration of an activity, t1 is the latest finish possible moment of its preceding activity and t2 is the earliest start possible moment, the independent float of the activity is
In the time-cost optimisation, using CPM method for network analysis, the crashing of the activities along the critical path is done starting with the activity having
Assertion (A): Activity 57 is critical. Reason (R): Earliest finish time and latest finish time for events 57 are same Select the correct answer.
If a is the optimistic time, b is the pessimistic time and m is most likely time of an activity, the expected time of the activity, is
If to, tp and tm are the optimistic, pessimistic and most likely time estimates of an activity respectively, the expected time t of the activity will be
If the total float and duration of an activity are 5 and 10 days respectively, the particular activity can be
If an activity has its optimistic, most likely and pessimistic times as 2, 3 and 7 respectively, then its expected time and variance are respectively
Whenever an activity has zero total float, then
Critical path method