126
79.4k
Chapter:

50+ Unit 4 Solved MCQs

in Information Systems Management

These multiple-choice questions (MCQs) are designed to enhance your knowledge and understanding in the following areas: Master of Business Administration (MBA) .

Chapters

Chapter: Unit 4
51.

……………… is a tabular method for describing the logic of the decisions to be taken.

A. Decision tables
B. Decision tree
C. Decision Method
D. Decision Data
Answer» D. Decision Data
52.

SDLC stands for

A. System Development Life Cycle
B. Structure Design Life Cycle
C. System Design Life Cycle
D. Structure development Life Cycle
Answer» A. System Development Life Cycle
53.

…………… can be defined as most recent and perhaps the most comprehensive technique for solving computer problems.

A. System Analysis
B. System Data
C. System Procedure
D. System Record
Answer» A. System Analysis
54.

A DFD is normally leveled as

A. It is a good idea in design
B. It is recommended by many experts
C. it is easy to do it
D. It is easier to read and understand a number of smaller DFDs than one large DFD
Answer» D. It is easier to read and understand a number of smaller DFDs than one large DFD
55.

Decision making model was proposed by ………………….

A. Harry Goode
B. Herbert A Simon
C. Recon Michal
D. None of this
Answer» B. Herbert A Simon
56.

A context diagram

A. Describes the context of a system
B. is a DFD which gives an overview of the system
C. is a detailed description of a system
D. is not used in drawing a detailed DFD
Answer» B. is a DFD which gives an overview of the system
57.

In the preliminary investigation phase of the SDLC, which of the following tasks would not be included?

A. briefly defining the problem
B. suggesting alternative solutions
C. gathering the data
D. preparing a short report
Answer» C. gathering the data
58.

A manager and the head of engineering discuss a change to a major work package. After the meeting, the manager contacts you and tells you to complete the paperwork to make the change. This is an example of:

A. Management attention to scope management.
B. Management planning.
C. A project expediter position.
D. A change control system.
Answer» C. A project expediter position.
59.

Which of the following processes has the Risk Register as the primary output?

A. Perform Qualitative Risk Analysis
B. Monitor and Control Risks
C. Plan Risk Management
D. Identify Risks
Answer» D. Identify Risks

Done Studing? Take A Test.

Great job completing your study session! Now it's time to put your knowledge to the test. Challenge yourself, see how much you've learned, and identify areas for improvement. Don’t worry, this is all part of the journey to mastery. Ready for the next step? Take a quiz to solidify what you've just studied.