101. |
In wooden stairs, the thickness of tread is adopted as |
A. | 28 mm |
B. | 38 mm |
C. | 48 mm |
D. | 58 mm |
Answer» B. 38 mm |
102. |
Brick nogging type of partition wall is constructed by |
A. | laying bricks as stretchers in cement mortar |
B. | laying bricks as headers in cement mortar |
C. | reinforcing the brick wall with iron straps |
D. | brick work built within a frame-work of wooden members |
Answer» D. brick work built within a frame-work of wooden members |
103. |
The pointing which is extensively used in brick work and stone masonry face work, is |
A. | flush poining |
B. | struck pointing |
C. | V-grooved pointing |
D. | tuck pointing |
Answer» A. flush poining |
104. |
A grillage foundation can be treated as a deep foundation. |
A. | Right |
B. | Wrong |
Answer» A. Right |
105. |
A retaining wall is commonly required in the construction of |
A. | hill roads |
B. | masonry dams |
C. | wing walls |
D. | all of these |
Answer» D. all of these |
106. |
In order to protect the beam against corrosion, a minimum cover of |
A. | 50 mm |
B. | 100 mm |
C. | 150 mm |
D. | 200 mm |
Answer» B. 100 mm |
107. |
The damp-proof course |
A. | may be horizontal or vertical |
B. | should be continuous |
C. | should be good impervious material |
D. | all of these |
Answer» D. all of these |
108. |
When the pile is required to penetrate beds of hard soil or soft rock to reach its required depth, the best method od driving the pile is by |
A. | drop hammer |
B. | steam hammer |
C. | water jets |
D. | boring |
Answer» D. boring |
109. |
A wateright structure constructed in connection with excavations for foundations of bridges, piers etc., is known as |
A. | caisson |
B. | cofferdam |
C. | well foundation |
D. | raft foundatio |
Answer» A. caisson |
110. |
The heading bond is usually used for |
A. | half brick wall |
B. | one brick wall |
C. | one and half brick wall |
D. | two brick wall |
Answer» B. one brick wall |
111. |
The higher water cement ratio in concrete results in |
A. | a weak mix |
B. | a stronger mix |
C. | better workable mix |
D. | less bleeding |
Answer» C. better workable mix |
112. |
The type of truss commonly used for spans varying from 5 to 9 metre is |
A. | queen post truss |
B. | king post truss |
C. | mansard truss |
D. | composite truss |
Answer» B. king post truss |
113. |
The size of a step commonly adopted for residential buildings is |
A. | 250 mm x 160 mm |
B. | 270 mm x 150 mm |
C. | 300 mm x 130 mm |
D. | 350 mm x 100 mm |
Answer» A. 250 mm x 160 mm |
114. |
The type of masonry in which the stones of irregular size and shapes are used and there are no regular courses, is known as |
A. | uncoursed rubble masonry |
B. | coursed rubble masonry |
C. | random rubble masonry |
D. | dry rubble masonry |
Answer» A. uncoursed rubble masonry |
115. |
A type of flooring made with special aggregate of marble chips mixed with white and coloured cement, is called |
A. | granolithic flooring |
B. | terrazzo flooring |
C. | mosaic flooring |
D. | asphalt flooring |
Answer» B. terrazzo flooring |
116. |
In stairs, the soffit is |
A. | a vertical portion of a step providing a support to the tread |
B. | a straight step having a parallel width of tread |
C. | the under surface of a stair |
D. | the angle which the line of nosing of the stair makes with the horizontal |
Answer» C. the under surface of a stair |
117. |
The failure of foundation of a building is due to |
A. | withdrawl of subsoil moisture |
B. | unequal settlement of soil |
C. | lateral escape of the supporting material |
D. | all of these |
Answer» D. all of these |
118. |
The filling in cavities with cement slurry is known as |
A. | coping |
B. | beam-filling |
C. | grouting |
D. | gunniting |
Answer» C. grouting |
119. |
The slump commonly adopted for concrete for columns is |
A. | 25 to 50 |
B. | 50 to 100 |
C. | 75 to 175 |
D. | 175 to 200 |
Answer» C. 75 to 175 |
120. |
In a brick nogging type of partition wall the vertical wooden members are called |
A. | noggings |
B. | studs |
C. | sills |
D. | templates |
Answer» B. studs |
121. |
A series of steps without any platform, break or landing in their direction, is called |
A. | riser |
B. | tread |
C. | flight |
D. | nosing |
Answer» C. flight |
122. |
The distance between the flanges of the beams in steel grillage foundation should not be more than twice the width of flange. |
A. | True |
B. | False |
Answer» A. True |
123. |
Pre-cast concrete piles are usually |
A. | reinforced concrete only |
B. | plain or reinforced concrete |
C. | reinforced concrete or pre-stressed concrete |
D. | plain, reinforced concrete or pre-stressed concrete |
Answer» C. reinforced concrete or pre-stressed concrete |
124. |
The brick flooring may be done with bricks |
A. | laid flat |
B. | set at right angle to the walls |
C. | laid on edge arranged in herring-bone fashion |
D. | all of the above |
Answer» D. all of the above |
125. |
The vertical members which support the door frame are called |
A. | reveals |
B. | styles |
C. | posts |
D. | jambs |
Answer» D. jambs |
126. |
A type of cast-in-situ pile which has an enlarged base and a corrugated stem, is |
A. | simplex pile |
B. | Franki pile |
C. | vibro-pile |
D. | Raymond pile |
Answer» B. Franki pile |
127. |
The type of foundation most suitable for brideges is |
A. | pier foundation |
B. | raft foundation |
C. | pile foundation |
D. | strap foundation |
Answer» C. pile foundation |
128. |
The cement which is commonly used in all types of structures and require no special consideration, is called |
A. | rapid hardening cement |
B. | normal setting cement |
C. | quick setting cement |
D. | white cement |
Answer» B. normal setting cement |
129. |
The depth of arch is the |
A. | vertical distance between the springing line and the highest point on the intrados |
B. | vertical distance between the springing line and the highest point on the extrados |
C. | perpendicular distance between the intrados and extrados |
D. | horizontal distance between the supports |
Answer» C. perpendicular distance between the intrados and extrados |
130. |
In residential building, the average value of stair width is |
A. | 600 mm |
B. | 700 mm |
C. | 800 mm |
D. | 900 mm |
Answer» D. 900 mm |
131. |
The process of filling up all mail holes, cracks etc. with putty is known as |
A. | knotting |
B. | priming |
C. | stopping |
D. | finishing |
Answer» C. stopping |
132. |
Coping is defined as a |
A. | horizontal course of masonry projecting from the face of the wall |
B. | horizontal moulded projection provided ner the top of a building |
C. | covering placed on the exposed top of an external wall |
D. | triangular shaped portion of masonry at the end of a sloped roof |
Answer» C. covering placed on the exposed top of an external wall |
133. |
Which of the following statement is correct? |
A. | The cavity should start near the ground level. |
B. | The cavity should terminate near eaves level in case of sloping roof. |
C. | The cavity should terminate near coping in case of flat roof with parapet wall. |
D. | all of the above |
Answer» D. all of the above |
134. |
The pitch of stair should never exceed |
A. | 20? |
B. | 25? |
C. | 30? |
D. | 40? |
Answer» D. 40? |
135. |
In a stretching bond |
A. | all the bricks are laid as headers |
B. | all the bricks are laid as stretchers |
C. | the arrangement of bricks is similar to English bond |
D. | the bonding bricks are laid at any angle other than zero or ninety degrees |
Answer» B. all the bricks are laid as stretchers |
136. |
For ordinary Portland cement, the initial setting time should not be more than |
A. | 30 minutes |
B. | 1 hour |
C. | 5 hours |
D. | 10 hours |
Answer» D. 10 hours |
137. |
Corbel is the extension of one or more course of bricks from the |
A. | face |
B. | back |
Answer» A. face |
138. |
The intermediate support of an arch is known as pier. |
A. | Right |
B. | Wrong |
Answer» A. Right |
139. |
If the water-cement ratio is low, the strength of the mix is high. |
A. | Agree |
B. | Disagree |
Answer» A. Agree |
140. |
The flooring made with small pieces of broken tiles of china glazed or of marble arranged in different pattern, is known as |
A. | asphalt flooring |
B. | mosaic flooring |
C. | terrazo flooring |
D. | granolithic flooring |
Answer» B. mosaic flooring |
141. |
Which of the following foundation is used for weaker soil? |
A. | Column footing |
B. | Grillage footing |
C. | Raft footing |
D. | all of these |
Answer» D. all of these |
142. |
A tomparary structure constructed in a river for excluding water from a given site to enable the building operation to be performed on dry surface, is called |
A. | caisson |
B. | cofferdam |
C. | well foundation |
D. | raft foundatio |
Answer» B. cofferdam |
143. |
The minimum depth of foundation for the load bearing wall of a building is restricted to |
A. | 600 mm |
B. | 700 mm |
C. | 800 mm |
D. | 900 mm |
Answer» D. 900 mm |
144. |
A pitched roof in which rafters slope to one side only is called |
A. | lean-to roof |
B. | Pent roof |
C. | Aisle roof |
D. | any one of these |
Answer» D. any one of these |
145. |
When two or more footings are connected by a beam, it is called |
A. | beam footing |
B. | combined footing |
C. | strap footing |
D. | mat footing |
Answer» C. strap footing |
146. |
A type of bond in a brick masonry in which each course consists of alternate headers and stretchers, is called |
A. | English bond |
B. | Flemish bond |
C. | stretching bond |
D. | heading bond |
Answer» B. Flemish bond |
147. |
The diameter of the drilled piles should not exceed |
A. | 200 mm |
B. | 400 mm |
C. | 600 mm |
D. | 800 mm |
Answer» C. 600 mm |
148. |
The dampness on roof may be due to |
A. | use of porous materials |
B. | insufficient lap of covering material |
C. | bad workmanship in plumbing |
D. | all of these |
Answer» D. all of these |
149. |
The perpendicular distance between the intrados and extrados of an arch, is called |
A. | pitch of an arch |
B. | depth of an arch |
C. | width of an arch |
D. | thickness of an arch |
Answer» B. depth of an arch |
150. |
For D.P.C. at plinth level, the commonly adopted material is |
A. | bitumen sheeting |
B. | plastic sheeting |
C. | mastic asphalt |
D. | cement concrete |
Answer» D. cement concrete |
Done Studing? Take A Test.
Great job completing your study session! Now it's time to put your knowledge to the test. Challenge yourself, see how much you've learned, and identify areas for improvement. Don’t worry, this is all part of the journey to mastery. Ready for the next step? Take a quiz to solidify what you've just studied.