451.

Financial compensation is the primary motivational tool for which of the following management theories or programs?

A. Zero Defects program
B. Theory X management
C. Theory Y management
D. Quality Control Circles
Answer» B. Theory X management
452.

The Pareto Principle is a technique used by quality managers to determine which quality control problems concerning a particular service or manufacturing process should be corrected. Which of the following statements best represents the philosophy employed by this principle?

A. In order to minimize financial losses from quality control problems, all problems which have a measurable cost associated with them should be corrected
B. The majority of defects are caused by a small percentage of the identifiable problems. Improvement efforts should be reserved for those few vital problems
C. In order to achieve zero defects, all quality control problems, including those which do not have a direct financial cost should be corrected
D. Generally, 80% of the quality control problems are justifiable for correction via cost benefit analysis. The remaining 20% are not financially worthy of improvement efforts
Answer» B. The majority of defects are caused by a small percentage of the identifiable problems. Improvement efforts should be reserved for those few vital problems
453.

The pillars of quality is (are)

A. Quality is free
B. Doing it right the first time
C. Zero defects
D. B and C
Answer» D. B and C
454.

Which is not a commonly used quality management tool?

A. Fishbone diagram
B. CSSR report
C. Pareto chart
D. None of the above (all are commonly used)
Answer» D. None of the above (all are commonly used)
455.

100% inspection for defects may be neither possible nor desirable, When is sampling for defects likely to be most useful?

A. When destructive testing is required
B. When the cost of 100% inspection is high
C. When we believe there are not many defects
D. A and B
Answer» D. A and B
456.

From the project manager's perspective, quality management is ______________ limited to assessing the attributes of the tools provided to do the work.

A. always
B. usually
C. not
D. seldom
Answer» C. not
457.

Quality assurance is defined as the managerial process that determines ______________ that provide the customers with performance standards and feedback on the performance.

A. time, scope, cost, and resources
B. human resources, dollars, materials, and duration
C. time, location, duration, and completion
D. organization, design, objectives, and resources
Answer» D. organization, design, objectives, and resources
458.

Statistical Decision Making includes Pareto Analysis as a means of reducing errors in the total project process. Pareto Analysis ______________.

A. is a method of rejecting errors or variances from standards following selfinspection
B. is a procedure for ranking the errors to identify those contributing the most to failures [PMBOK p. B-2]
C. counts errors or failures to determine the added cost of all operations that do not meet the requirements
D. compares the error rate with the pass rate to determine the allowable number of errors per 1,000
Answer» B. is a procedure for ranking the errors to identify those contributing the most to failures [PMBOK p. B-2]
459.

When errors that affect quality are discovered, the procedure to improve the situation should be to ______________.

A. identify the specific error
B. correct the specific error
C. determine the root causes of the error
D. all of the above
Answer» D. all of the above
460.

Which of the following models value stability?

A. Organism model
B. Mechanistic model
C. Cultural model
D. Total Quality model
Answer» B. Mechanistic model
461.

Quality in a project's product is essential for the enhancement of the project manager and the selling organization. To ensure that the customer perceives a quality product, the project manager must inform the ustomer of the ______________ to be used so the customer will not have a perception of ______________.

A. materials; inferior fabrication
B. standards; gold plating
C. practices; poor workmanship
D. pricing; gouging
Answer» B. standards; gold plating
462.

In the quality area, process control is becoming an important element of the manufacturing to rigorous specifications to provide a consistently uniform output. The control of a process is divided into controlling temperatures, pressures, flows, ______________, and levels in terms of rates and time.

A. directions, elasticity’s
B. volumes, distances
C. speeds (velocities), volumes
D. distances, speeds (velocities)
Answer» D. distances, speeds (velocities)
463.

Reworking ______________ the cost of quality.

A. Decreases
B. Increases
C. Neutralizes
D. none
Answer» B. Increases
464.

The inspection of the project through the implementation phase is critical to ensure that quality standards are being met. The use of vendors is most often required to obtain critical materials, components, or sub-assemblies. To determine a vendor's capabilities to produce to the specifications, a "shop survey" or audit of the vendor may be required. e areas for the audit should include ______________.

A. facilities and shop space
B. experience and capability with similar work
C. quality assurance an control procedures
D. organization and quality of work in process
Answer» C. quality assurance an control procedures
465.

Taguchi suggested that loss in a process is'increased with increase in which of the following?

A. Specifications
B. Standards
C. Competition
D. Variability
Answer» D. Variability
466.

Some organizations emphasizes the use of quality tools but failed to do which of the following?

A. Focus on what is truly important to the distributors
B. Incorporate continuous improvement efforts
C. Make fundamental changes in their processes and culture
D. Focus on what is truly important to the customer
Answer» B. Incorporate continuous improvement efforts
467.

Which of the following statements is TRUE about Deming’s philosophy?

A. It is based on improving products and services by reducing uncertainty and variability in the design and manufacturing processes
B. Quality is either or not present in the whole organization; that quality is the responsibility of everyone in the organization
C. Increasing conformance to specifications through elimination of defects, supported extensively by statistical tools for analysis
D. Increasing loss, for the producer, the customer, and society, associated with increasing variability from a target value
Answer» B. Quality is either or not present in the whole organization; that quality is the responsibility of everyone in the organization
468.

Nonconformance is an expense of:

A. Profit of quality
B. Defects of quality
C. Quality of product
D. Cost of quality
Answer» D. Cost of quality
469.

Best price or zero cost is

A. To keep defective products aside, ensuring they
B. do not reach the customers
C. Prerogative cost
D. To count, grade, and rework
Answer» C. Prerogative cost
470.

The concept that it is easier and less costly to do the work right the first time is called:

A. Zero defects
B. Continuous improvement
C. DTRTRTFT
D. The customer is the next person in the process
Answer» C. DTRTRTFT
471.

Which of the following statements concerning acceptance sampling is false?

A. Used when expensive and time-consuming to test the product 100%.
B. The number of allowable defects before lot is rejected is predetermined.
C. Inspection and test standards must be established to ensure that procedures can adequately determine conformance and nonconformance.
D. All of the above are true
Answer» D. All of the above are true
472.

Quality attributes

A. are used to determine how effectively the organization accomplishes its goals
B. can be objective or subjective in nature
C. are specific quality characteristics for which a product is designed, built, and tested
D. B and C
Answer» D. B and C
473.

When a product or service completely meets a customer's requirements:

A. quality is achieved
B. cost of quality is high
C. cost of quality is low
D. the customer pays the minimum price
Answer» A. quality is achieved
474.

The concept that states: "the optimal quality level is reached at the point where the incremental revenue from product improvement equals the incremental cost to secure it" comes from:

A. quality control analysis
B. marginal analysis
C. standard quality analysis
D. conformance analysis
Answer» B. marginal analysis
475.

An assignable variance tells us:

A. our equipment is becoming obsolete
B. top management should initiate increased worker training
C. there is an identifiable problem that must be fixed
D. schedule variances will be reduced
Answer» C. there is an identifiable problem that must be fixed
476.

A fundamental tenet of modern quality management holds that quality is most likely to be achieved:

A. by planning it into the project
B. by developing careful mechanisms to inspect for quality
C. by developing prestigious products and processes
D. by striving to do the best job possible
Answer» A. by planning it into the project
477.

Which of the following is least likely to contribute to developing an effective project team supportive of quality?

A. Commitment to the project
B. Team member flexibility
C. Frequent turnover of personnel
D. Team interest in workmanship
Answer» C. Frequent turnover of personnel
478.

Quality management is defined as the process of ensuring that a project meets the ______________ of the project's clients, participants, and shareholders.

A. specifications and statements of work
B. legal and financial obligations
C. expectations and desires
D. needs and expectations
Answer» D. needs and expectations
479.

Statistical Process Control is used in quality programs to determine whether repetitive operations meet predictable standards. The process uses ______________ to permit accurate monitoring of the operation.

A. 100 percent inspection and random rejection
B. acceptance sampling and automatic rejection
C. continuous sampling and error detection methods
D. statistical sampling and control procedures
Answer» D. statistical sampling and control procedures
480.

Quality control methods extend beyond the external characteristics of the product or components of the product. The types of testing of the product or components include ______________.

A. operator, maintainer, and environmental
B. stress, destructive, and operating
C. in-house, public, and private
D. laboratory, destructive, and non-destructive
Answer» C. in-house, public, and private
481.

In the area of quality, project managers are struggling with the training and indoctrination of individuals in the need to do the work right the first time to conform to the requirement. Occasionally, the project manager will discover an individual, either in the planning or actual work, doing more than is called for in the specification. These individuals need training to reduce the level of "over building" because ______________.

A. the extra value given to the customer is not recognized or needed to complete the project
B. the increase to the system specifications place that portion out of balance with the other system components
C. it leads to increased customer requirements for other parts of the system
D. exceeding the specified requirement is asting time and money at no value added to the project
Answer» D. exceeding the specified requirement is asting time and money at no value added to the project
482.

The overall intentions and direction of an organization with regard to quality as formally expressed by top management is a:

A. Quality Plan
B. Quality Statement
C. Quality Policy
D. TQM
Answer» C. Quality Policy
483.

Which of the following is not considered a cost of nonconformance to quality?

A. Scrap
B. Rework
C. Expediting
D. Process control
Answer» D. Process control
484.

The same quality control manager decides to increase his daily sample size from three to six. The size of the control band will:

A. Increase
B. Decrease
C. Remain unchanged
D. Not determinable from given data
Answer» B. Decrease
485.

An acceptance control chart has limits that are based on the specification limits for the product rather than limits which differentiate between random and assignable causes. Under which if the following circumstance should a QC manager consider using an acceptance control chart?

A. When the engineering tolerance on a dimension greatly exceeds the natural dispersion of the manufacturing process
B. When the number of samples outside the current control chart limits become too costly and cumbersome to investigate
C. When a process is subject to constant but stable tool wear
D. A and C
Answer» D. A and C
486.

Cost of quality is a concept that includes:

A. the cost necessary for ensuring conformance to requirements
B. the life cycle cost of the project
C. al research and development costs related to the project
D. only the cost of the quality control function
Answer» A. the cost necessary for ensuring conformance to requirements
487.

Quality management includes forming and directing a team of people to achieve a qualitative goal within an effective cost and time frame that results in:

A. a project completed in the shortest possible time
B. a product or service that conforms to the requirement specification
C. an award-winning product that brings public recognition to the project
D. an innovative project that establishes the qualifications of the project team
Answer» B. a product or service that conforms to the requirement specification
488.

If the level of confidence directly increases as a result of new processes, different resources, or changed methods, the required cost of monitoring is likely to:

A. increase as well
B. remain the same
C. decrease
D. decrease initially then increase slightly
Answer» C. decrease
489.

A project manager notices that all the measurements recorded on a control chart lie within the control band range. However, most of the measurements are below the midpoint (negative variance). Quality management practice offers us what guidance in dealing with this situation?

A. The project manager should apply the "rule of seven"
B. There is no problem as long as the variances lie within the control band
C. Negative variance indicates a problem which should be remedied
D. These variances are most likely caused by random factors
Answer» A. The project manager should apply the "rule of seven"
490.

Just-in-time (JIT) is the concept of reducing inventories to:

A. 25% of former stock
B. Less than half of former stock
C. 75% of peak stock
D. zero stock
Answer» D. zero stock
491.

Unless evidence indicates otherwise, a process is assured to be:

A. in control
B. out of control
C. working at full capacity
D. working at less than full capacity
Answer» A. in control
492.

Statistical Process Control uses diagrams called "Control Charts." These charts depict horizontal, parallel lines to represent ______________ standard deviations.

A. six
B. five
C. four
D. three
Answer» D. three
493.

A quality audit is a powerful tool in any quality improvement program. For a project that is starting a quality improvement program, the initial audit is used to ______________.

A. identify all the faculty work that has been completed
B. identify all the work that has been correctly accomplished
C. determine the single most urgent area for improvement
D. determine the quality baseline from which improvements will be made
Answer» D. determine the quality baseline from which improvements will be made
494.

The 14-step process to quality improvement is a progressive to total involvement of everyone in a company toward the production of quality products and services. The 14-steps do not include ______________.

A. management commitment
B. quality improvement team
C. quality measurement
D. goal achievement measures
Answer» D. goal achievement measures
495.

Each project needs a quality program plan to define the parameters of the overall approach to meeting quality requirements. As a minimum, the quality program plan addresses ______________.

A. the required processes and procedures
B. the inspection plan
C. the types of test to be conducted
D. The documentation requirements for actions (testing, inspections, etc.)
Answer» D. The documentation requirements for actions (testing, inspections, etc.)
496.

Which of the following is not a benefit of long-term suppler relationships?

A. supplier involvement in design
B. information system linkages to customer facilities
C. capacity and facility plans favorable to their customers
D. all of the above are benefits
Answer» D. all of the above are benefits
497.

Which of the following models has the viewpoint that change and learning are valued in themselves?

A. Organism mode
B. Mechanistic model
C. Cultural model
D. Total Quality model
Answer» C. Cultural model
498.

The standards for output based on quality and customer- service requirements that originate at the organizational and process levels include requirements for all of the following EXCEPT:

A. Accuracy
B. Innovation
C. Timeliness
D. Turnover
Answer» D. Turnover
499.

Why the factory managers created inspection departments?

A. To keep defective products aside, ensuring
B. they do not reach the customers
C. To ensure quantity of goods/services
D. To count, grade, and rework
Answer» A. To keep defective products aside, ensuring
500.

Nonconformance is an expense of

A. Profit of quality
B. Defects of quality
C. Quality of product
D. Cost of quality
Answer» D. Cost of quality

Done Studing? Take A Test.

Great job completing your study session! Now it's time to put your knowledge to the test. Challenge yourself, see how much you've learned, and identify areas for improvement. Don’t worry, this is all part of the journey to mastery. Ready for the next step? Take a quiz to solidify what you've just studied.